Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all. Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.


Donate now and support open access to energy expertise

Thank you for your support, your donation, big or small, truly matters!

Micro Hydro Power (MHP) - Ethiopia, Ererte

From energypedia
Revision as of 15:33, 12 January 2015 by ***** (***** | *****)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Overview

Location of the Micro Hydro Power (MHP) site:

  • Country: Ethiopia
  • District: Bona
  • Kebele: Beshiro Gute
  • River: Ererte
  • GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E


Details

The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.
► Click here for more information.

  • Start of Construction: August 2009
  • Date of Commissioning: -
  • Ownership: Robot Electric Users Cooperative/community based cooperative society
  • Tariff Structure: Flat rate/monthly based per appliance
  • Technical Specification:
    • Canal: Lined stone masonry having a length of 53m
    • Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured
    • Turbine: T-15 cross flow turbine /Manufactured locally
    • Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR
    • Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km)


Pictures

Ererti Fall.JPG
Ererti Fall
Ererti MHP site.JPG
Ererti MHP site
Ererti MHP weir ,Intake and canal.JPG
Ererti MHP weir, intake and canal
Locally Manufactured T-15 Turbine.JPG
Locally manufactured T-15 turbine


Further Information


References