Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all. Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.


Donate now and support open access to energy expertise

Thank you for your support, your donation, big or small, truly matters!

Tekeze

From energypedia
Revision as of 12:20, 13 July 2012 by ***** (***** | *****)


Back to the Hydropower Sites Database

General Information

Country: Ethiopia
City/Town: Amhara
Coordinates (Powerhouse): The following coordinate was not recognized: Latitude= 13.3492, Longitude= 38.74049.The following coordinate was not recognized: Latitude= 13.3492, Longitude= 38.74049.
Year of Commission: 2009
Basin Name: Tekeze River (a tributary of Atbarah River which is a tributary of the Nile)
Stream Name:
Developer:
Operator: Ethiopian national grid at Mekele
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 300000
Energy (kWh/a): 981000000
Capacity Factor (%): 37
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s): 119
Minimum Flow of the Stream (m³/s):
Head (m): 155
Turbine Type: Fracis turbines
Turbine Manufacturer: Dongfang China
Generator Type:
Generator Capacity (kW):
Generator Manufacturer: Dongfang China
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m): 105000
Voltage (v): 230000
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material: Concrete Arch Dam
Dam Height [m]: 188
Length of Dam [m]: 420
Storage Volume of Reservoir (m³): 9310000000
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€): 364,999,999
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment: Project Financed By: China Exim Bank ($50 million)
Link to Cost Breakdown: