Difference between revisions of "Tekeze"
From energypedia
***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Ethiopia |HPDBCity/Town=Amhara |HPDBCoordinates=Latitude= 13.3492, Longitude= 38.74049 |HPDBDate of Commission= 2009 |HPDBBasin Name=Tekeze River (a tributary...") |
***** (***** | *****) |
||
Line 3: | Line 3: | ||
|HPDBCity/Town=Amhara | |HPDBCity/Town=Amhara | ||
|HPDBCoordinates=Latitude= 13.3492, Longitude= 38.74049 | |HPDBCoordinates=Latitude= 13.3492, Longitude= 38.74049 | ||
− | |HPDBDate of Commission= 2009 | + | |HPDBDate of Commission=2009 |
|HPDBBasin Name=Tekeze River (a tributary of Atbarah River which is a tributary of the Nile) | |HPDBBasin Name=Tekeze River (a tributary of Atbarah River which is a tributary of the Nile) | ||
|HPDBOperator=Ethiopian national grid at Mekele | |HPDBOperator=Ethiopian national grid at Mekele | ||
|HPDBProject Status=Completed | |HPDBProject Status=Completed | ||
|HPDBPower=300000 | |HPDBPower=300000 | ||
− | |HPDBEnergy= | + | |HPDBEnergy=981000000 |
+ | |HPDBCapacity Factor=37 | ||
|HPDBPenstock Flow=119 | |HPDBPenstock Flow=119 | ||
|HPDBHead=155 | |HPDBHead=155 |
Revision as of 12:20, 13 July 2012
Back to the Hydropower Sites Database
General Information
Country: | Ethiopia |
---|---|
City/Town: | Amhara |
Coordinates (Powerhouse): | The following coordinate was not recognized: Latitude= 13.3492, Longitude= 38.74049.The following coordinate was not recognized: Latitude= 13.3492, Longitude= 38.74049. |
Year of Commission: | 2009 |
Basin Name: | Tekeze River (a tributary of Atbarah River which is a tributary of the Nile) |
Stream Name: | |
Developer: | |
Operator: | Ethiopian national grid at Mekele |
Project Status: | Completed |
Any other uses of the water source: | |
Contact: | |
Comment: | |
Link to Photos: |
Technical Information
Power: (kW) | 300000 |
---|---|
Energy (kWh/a): | 981000000 |
Capacity Factor (%): | 37 |
Penstock Diameter (mm): | |
Penstock Length (m): | |
Penstock Material (m³/s): | |
Maximum Flow of the Penstock (m³/s): | 119 |
Minimum Flow of the Stream (m³/s): | |
Head (m): | 155 |
Turbine Type: | Fracis turbines |
Turbine Manufacturer: | Dongfang China |
Generator Type: | |
Generator Capacity (kW): | |
Generator Manufacturer: | Dongfang China |
Comment: |
Mini/Island Grid Information
Mini Grid: | No |
---|---|
Load Control Information: | |
Connection Type: | |
Public Lighting: | |
Length of Transmission Line (m): | 105000 |
Voltage (v): | 230000 |
Transmission Conductor (type) : | |
Diameter of Conductor (mm²): | |
Transformer Rating (kVA): | |
Link to Grid: | |
S.W.E.R: | |
Operational Period (Xdays/year): | |
Comment: |
Dam Information
Dam Type: |
Dam on river with reservoir |
---|---|
Dam Construction Material: | Concrete Arch Dam |
Dam Height [m]: | 188 |
Length of Dam [m]: | 420 |
Storage Volume of Reservoir (m³): | 9310000000 |
Flood Storage of Reservoir: | |
Channel Material: | |
Comment: |
Economic Information
Cost (€): | 364,999,999 |
---|---|
Donor/Financier & Percentage: | |
Tariff Levels: | |
Connected Households: | |
Connection Cost (€): | |
Cost to be Covered by Households (%): | |
Comment: | Project Financed By: China Exim Bank ($50 million) |
Link to Cost Breakdown: |