Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Ererte"

From energypedia
***** (***** | *****)
m (moved Ererti MHP to Ererte MHP)
***** (***** | *****)
Line 2: Line 2:
  
 
*<u>Country</u>: Ethiopia  
 
*<u>Country</u>: Ethiopia  
*<u>District</u>: Hula
+
*<u>District</u>: Bona
 
*<u>Kebele</u>: Beshiro Gute  
 
*<u>Kebele</u>: Beshiro Gute  
 
*<u>River</u>: Ererte<br>  
 
*<u>River</u>: Ererte<br>  
Line 9: Line 9:
 
<br>  
 
<br>  
  
The MHP plant Ererte has a capacity of 33 kW and was inaugurated in May 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.  
+
The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in Septmber 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.  
  
 
<br> '''Start of Construction: '''August 2009  
 
<br> '''Start of Construction: '''August 2009  
Line 28: Line 28:
 
*Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured&nbsp;  
 
*Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured&nbsp;  
 
*Turbine: T-15 cross flow turbine /Manufactured locally  
 
*Turbine: T-15 cross flow turbine /Manufactured locally  
*Generator:  
+
*Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 KVA, 33.6KW, 50 Hz, Efficiency - 89%, 380/440V(adjustable), 3 phase series STAR
*Grid: Wooden pole, ABC cable(2.76Km)
+
*Grid: Low Voltage distribution with ABC cable and Wooden pole(2.76Km)
  
 
<br>  
 
<br>  
  
{| width="100%" cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders"
+
{| cellspacing="1" cellpadding="1" border="0" width="100%" class="FCK__ShowTableBorders"
 
|-
 
|-
 
| [[Image:Ererti Fall.JPG|left|370px|Ererti Fall.JPG]]  
 
| [[Image:Ererti Fall.JPG|left|370px|Ererti Fall.JPG]]  
 
| [[Image:Ererti MHP site.JPG|left|370px|Ererti MHP site.JPG]]
 
| [[Image:Ererti MHP site.JPG|left|370px|Ererti MHP site.JPG]]
 
|-
 
|-
| Ererte waterfall<br>
+
| Ererte waterfall<br>  
 
| Ererte MHP site<br>
 
| Ererte MHP site<br>
 
|-
 
|-
Line 44: Line 44:
 
| [[Image:Locally Manufactured T-15 Turbine.JPG|left|370px|Locally Manufactured T-15 Turbine.JPG]]
 
| [[Image:Locally Manufactured T-15 Turbine.JPG|left|370px|Locally Manufactured T-15 Turbine.JPG]]
 
|-
 
|-
| Ererte intake and canal<br>
+
| Ererte intake and canal<br>  
 
| Locally Manufactured T-15 Turbine<br>
 
| Locally Manufactured T-15 Turbine<br>
 
|}
 
|}

Revision as of 15:27, 31 July 2011

Location of the site:

  • Country: Ethiopia
  • District: Bona
  • Kebele: Beshiro Gute
  • River: Ererte
  • GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E


The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in Septmber 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.


Start of Construction: August 2009

Date of Commissioning:


Ownership: Robot Electric Users Cooperative/community based cooperative society

Tariff Structure: Flat rate/monthly based per appliance


Technical Specification:

  • Canal: Lined stone masonry having a length of 53m
  • Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured 
  • Turbine: T-15 cross flow turbine /Manufactured locally
  • Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 KVA, 33.6KW, 50 Hz, Efficiency - 89%, 380/440V(adjustable), 3 phase series STAR
  • Grid: Low Voltage distribution with ABC cable and Wooden pole(2.76Km)


Ererti Fall.JPG
Ererti MHP site.JPG
Ererte waterfall
Ererte MHP site
Ererti MHP weir ,Intake and canal.JPG
Locally Manufactured T-15 Turbine.JPG
Ererte intake and canal
Locally Manufactured T-15 Turbine