Difference between revisions of "Micro Hydro Power in Leku, Ethiopia"
***** (***** | *****) |
***** (***** | *****) |
||
Line 1: | Line 1: | ||
− | = <span class="mw-headline | + | = <span id="Overview" class="mw-headline">Overview </span><br/> = |
<u>Location of the '''Micro Hydro Power (MHP)''' site:</u> | <u>Location of the '''Micro Hydro Power (MHP)''' site:</u> | ||
Line 7: | Line 7: | ||
*'''District:''' Jimma<br/> | *'''District:''' Jimma<br/> | ||
*'''River:''' Boru river<br/> | *'''River:''' Boru river<br/> | ||
− | *'''GPS Coordinates: '''<br/> | + | *'''GPS Coordinates: '''Between 7<sup>o</sup>17’ & 7<sup>o</sup>44’ North and between 36<sup>o</sup>17’& 36<sup>o</sup><br/> |
<br/> | <br/> | ||
Line 17: | Line 17: | ||
The economic base of the Leku Migira kebele is directly linked to agriculture, mainly production of coffee and maize. A total population of about 3,985 is living in the kebele within 782 households in 25 smaller neighborhoods (gares). This project at its full capacity will benefit about 200 households. | The economic base of the Leku Migira kebele is directly linked to agriculture, mainly production of coffee and maize. A total population of about 3,985 is living in the kebele within 782 households in 25 smaller neighborhoods (gares). This project at its full capacity will benefit about 200 households. | ||
− | + | <br/> | |
= Objective = | = Objective = | ||
Line 25: | Line 25: | ||
<br/> | <br/> | ||
− | = <span class="mw-headline | + | = <span id="Details" class="mw-headline">Details </span><br/> = |
The MHP plant Leku has a capacity of 20 kW and is planned to be inaugurated in beginning of 2016. A total of approximately 250 households will be connected to the plant, in addition to social institutions for example: a mosque, a school, a commercial center, a health center, a Farmers Training Center (FTC), a co-operative office and a grain mill owned by Chokerisa Kenisa Leku co-operative.<br/> | The MHP plant Leku has a capacity of 20 kW and is planned to be inaugurated in beginning of 2016. A total of approximately 250 households will be connected to the plant, in addition to social institutions for example: a mosque, a school, a commercial center, a health center, a Farmers Training Center (FTC), a co-operative office and a grain mill owned by Chokerisa Kenisa Leku co-operative.<br/> | ||
Line 36: | Line 36: | ||
*'''Tariff structure: '''Not yet derived<br/> | *'''Tariff structure: '''Not yet derived<br/> | ||
*'''Turbine: '''<br/> | *'''Turbine: '''<br/> | ||
− | *'''Generator:'''<br/> | + | *'''Generator: '''<br/> |
− | * | + | *'''Electric load controller capacity: '''<br/> |
− | '''Electric load controller capacity: | + | *'''Transmission line type/length:''' Aluminum cable/3300m |
− | + | <br/> | |
− | + | ||
+ | = <span id="Pictures" class="mw-headline">Pictures </span><br/> = | ||
+ | |||
+ | [[File:Generator Leku.jpg|left]]<br/> | ||
<br/> | <br/> | ||
− | + | [[File:PH and Penstock.jpg|left]]<br/> | |
<br/> | <br/> | ||
+ | |||
+ | [[File:River Leku.jpg|left]]<br/> | ||
+ | |||
+ | |||
+ | |||
+ | [[File:Turbine Leku.jpg|left]] |
Revision as of 11:31, 10 August 2015
Overview
Location of the Micro Hydro Power (MHP) site:
- Country: Ethiopia Energy Situation
- District: Jimma
- River: Boru river
- GPS Coordinates: Between 7o17’ & 7o44’ North and between 36o17’& 36o
Background
Leku Migira Mill Upgrading Project is located on the Boru River in Jimma zone. The project seeks to re-develop an existing water mill scheme into dual purpose mechanical mill facility as productive use as well as electrical power generation plant. It is located in the Oromia regional state, Jimma zone, Shebe Sombo woreda.
The economic base of the Leku Migira kebele is directly linked to agriculture, mainly production of coffee and maize. A total population of about 3,985 is living in the kebele within 782 households in 25 smaller neighborhoods (gares). This project at its full capacity will benefit about 200 households.
Objective
The general objective of the project is to incorporate into the existing traditional watermill plant, electric generating facility to provide modern clean, affordable and sustainable energy for the kebele. In addition, the project aims to improve the living standard of inhabitants in the kebele.
Details
The MHP plant Leku has a capacity of 20 kW and is planned to be inaugurated in beginning of 2016. A total of approximately 250 households will be connected to the plant, in addition to social institutions for example: a mosque, a school, a commercial center, a health center, a Farmers Training Center (FTC), a co-operative office and a grain mill owned by Chokerisa Kenisa Leku co-operative.
- Start of construction: December 2013
- Date of Commissioning: Planned for beginning of 2016
- Ownership / Operation Modell:
- Tariff structure: Not yet derived
- Turbine:
- Generator:
- Electric load controller capacity:
- Transmission line type/length: Aluminum cable/3300m
Pictures