Difference between revisions of "Micro Hydro Power (MHP) - Ethiopia, Ererte"
From energypedia
***** (***** | *****) |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
− | + | Overview = | |
− | + | <u>Location of the site:</u> | |
− | * | + | *Country: Ethiopia |
− | * | + | *District: Bona |
− | * | + | *Kebele: Beshiro Gute |
− | * | + | *River: Ererte |
+ | *GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E | ||
− | <br> | + | <br/> |
− | + | = Details = | |
− | + | The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700. | |
− | + | Click [[:file:Factsheet ererti.pdf|here]] for more information. | |
− | ''' | + | <br/>'''Start of Construction: '''August 2009 |
− | + | '''Date of Commissioning:''' | |
− | + | <br/> | |
− | ''' | + | '''Ownership:''' Robot Electric Users Cooperative/community based cooperative society |
− | + | '''Tariff Structure:''' Flat rate/monthly based per appliance | |
− | + | <br/> | |
− | *Canal: Lined stone masonry having a length of 53m | + | '''Technical Specification:''' |
− | *Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured | + | *Canal: Lined stone masonry having a length of 53m |
− | *Turbine: T-15 cross flow turbine /Manufactured locally | + | *Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured |
− | *Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR | + | *Turbine: T-15 cross flow turbine /Manufactured locally |
+ | *Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR | ||
*Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km) | *Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km) | ||
− | |||
− | {| | + | |
+ | = Pictures = | ||
+ | |||
+ | {| cellspacing="1" cellpadding="1" border="0" style="width: 100%" class="FCK__ShowTableBorders" | ||
|- | |- | ||
− | | [[ | + | | [[File:Ererti Fall.JPG|left|370px|Ererti Fall.JPG|alt=Ererti Fall.JPG]] |
− | | [[ | + | | [[File:Ererti MHP site.JPG|left|370px|Ererti MHP site.JPG|alt=Ererti MHP site.JPG]] |
|- | |- | ||
− | | Ererte waterfall<br> | + | | Ererte waterfall<br/> |
− | | Ererte MHP site<br> | + | | Ererte MHP site<br/> |
|- | |- | ||
− | | [[ | + | | [[File:Ererti MHP weir ,Intake and canal.JPG|left|370px|Ererti MHP weir ,Intake and canal.JPG|alt=Ererti MHP weir ,Intake and canal.JPG]] |
− | | [[ | + | | [[File:Locally Manufactured T-15 Turbine.JPG|left|370px|Locally Manufactured T-15 Turbine.JPG|alt=Locally Manufactured T-15 Turbine.JPG]] |
|- | |- | ||
− | | Ererte intake and canal<br> | + | | Ererte intake and canal<br/> |
− | | Locally Manufactured T-15 Turbine<br> | + | | Locally Manufactured T-15 Turbine<br/> |
|} | |} | ||
− | |||
+ | |||
+ | = Further Information = | ||
+ | |||
+ | = References = | ||
+ | |||
+ | <references /> | ||
+ | |||
+ | [[Category:Hydro]] | ||
[[Category:Ethiopia]] | [[Category:Ethiopia]] | ||
− |
Revision as of 15:01, 25 July 2013
Overview =
Location of the site:
- Country: Ethiopia
- District: Bona
- Kebele: Beshiro Gute
- River: Ererte
- GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E
Details
The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.
Click here for more information.
Start of Construction: August 2009
Date of Commissioning:
Ownership: Robot Electric Users Cooperative/community based cooperative society
Tariff Structure: Flat rate/monthly based per appliance
Technical Specification:
- Canal: Lined stone masonry having a length of 53m
- Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured
- Turbine: T-15 cross flow turbine /Manufactured locally
- Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 kVA, 33.6 kW, 50 Hz, Efficiency - 89%, 380/440 V(adjustable), 3 phase series STAR
- Grid: Low Voltage distribution with ABC cable and Wooden pole (2.76 km)
Pictures
Ererte waterfall |
Ererte MHP site |
Ererte intake and canal |
Locally Manufactured T-15 Turbine |