Difference between revisions of "File:Establishment of Local PV System Battery Testing Procedure.doc"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
 
(3 intermediate revisions by one other user not shown)
Line 8: Line 8:
 
== Licensing ==
 
== Licensing ==
  
{{license_otherswork_World_Bank}}
+
{{Cc-by-nc-4.0}}
  
 
<br/>
 
<br/>
  
 
[[Category:Batteries|{{PAGENAME}}]]
 
[[Category:Batteries|{{PAGENAME}}]]
 +
[[Category:Photovoltaic_(PV)|{{PAGENAME}}]]
 
[[Category:Battery_Charging_Systems|{{PAGENAME}}]]
 
[[Category:Battery_Charging_Systems|{{PAGENAME}}]]
 
[[Category:Off-grid|{{PAGENAME}}]]
 
[[Category:Off-grid|{{PAGENAME}}]]
[[Category:PRC_Terms_of_Reference|{{PAGENAME}}]]
+
[[Category:REPRC_Terms_of_Reference|{{PAGENAME}}]]
[[Category:PV|{{PAGENAME}}]]
+
[[Category:Project_Resource_Center|{{PAGENAME}}]]
[[Category:Photovoltaic|{{PAGENAME}}]]
 

Latest revision as of 11:07, 11 June 2014

Summary

The overall objective of this TOR is strengthening the capability of PV systems battery certification and testing. The consultant will provide recommendations for a technical standard and test procedures for certifying batteries to be used in PV sytems, inspect and address the current battery testing capabilities in the country, and prepare TOR for strengthening the capability of the testing center.


Licensing

⧼wm-license-cc-wiki-link⧽
attribution NonCommercial
This file is licensed under the Creative CommonsAttribution-NonCommercial 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must attribute the work in the manner specified by the author or licensor (but not in any way that suggests that they endorse you or your use of the work).
  • NonCommercial – You may not use the material for commercial purposes.


File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current23:38, 27 September 2013 (51 KB)***** (***** | *****)The overall objective of this TOR is strengthening the capability of PV systems battery certification and testing. The consultant provides recommendations for comparative performance tests, tests under conditions similar to that experienced in reality,...

There are no pages that use this file.