MHP Template

From energypedia
Revision as of 14:39, 3 April 2014 by ***** (***** | *****)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Overview

Name of the site:
Country:
Turbine Type:
Power Output:
Project Status:
Comments:






Operation Data

Gross Head:
Net/Design Head:
Flow (design flow):
Comments on flow variation during the year:






Technical Information

Comments:



Civil Works and Penstock

Dam construction material:
Dam Dimensions:
Storage Volume Reservoir:
Sedimentation Basin material:
Sedimentation Basin Dimensions:
Penstock Length:
Penstock Diameter at Beginning:
Penstock Diameter at End:
Penstock Changes of Diameter:
Penstock Material:
Security Valve:



Electromechanical Equipment

Turbine

Turbine Type:
Turbine Diameter:
Turbine Material:
Turbine Manufacturer:
Potencial (nominal):
Rated Head:
Rated Flow:
Rated Speed:
Runaway Speed:
Shaft diameter and material:
Direction of Rotation:
Orientation of Shaft:




Generator:

Generator Manufacturer and Model:
Phases:
Potencial (nominal):
Nominal voltage:
Nominal Speed:
Frequency:
Isolation Class:



Mechanical Transmission / Coupling

Type of Belt:
Belt Manufacturer:
Distance between Pulleys:
Diameter of Generator Pulley:
Diameter of Generator Pulley:

Control System

Control System Manufacturer and Model:
Type of Control:
Capacity:



Electrical Transmission

Mini Grid:
Connection to national Grid:
Grid Voltage:
Diameter of Conductor:
Transformer Rating:




Economic Information

Developer: (Contact: )
Start of Construction:
Date of Commissioning:
Ownership / Operation Model:
Operator:
Tariff structure:
Connected Housholds:
Connection Cost Cost to be covered by houshold:
Overall Project Costs:









Project Photos