MHP La Laguna
From energypedia
Revision as of 00:16, 29 March 2014 by ***** (***** | *****)
Overview
Name of the site: | El Plan |
Country: | Nicaragua (GPS Coordinates: ?) |
Turbine Type: | Pelton |
Power Output: | 54 kW |
Project Status: | in operation |
Comments: | - |
Operation Data
Gross Head: |
47m (GPS data) |
Net/Design Head: | - |
Flow (design flow): | - |
Comments on flow variation during the year: | - |
Technical Information
Comments: | - |
Civil Works and Penstock
Dam construction material: | Concrete |
Dam Dimensions: | - |
Storage Volume Reservoir: | - |
Sedimentation Basin material: | Concrete |
Sedimentation Basin Dimensions: | - |
Penstock Length: | 700m |
Penstock Diameter at Beginning: | 10" |
Penstock Diameter at End: | 8" |
Penstock Changes of Diameter: | 1 |
Penstock Material: | PVC |
Security Valve: | 8" |
Electromechanical Equipment
Turbine
Turbine Type: | Pelton, 2 injectors |
Turbine Diameter: | - |
Turbine Material: | Bronze |
Turbine Manufacturer: | Nica Bosch (Contact: company does not exist any more) |
Potencial (nominal): | |
Rated Head: | |
Rated Flow: | |
Rated Speed: | |
Runaway Speed: | |
Shaft diameter and material: | |
Direction of Rotation: | clockwise |
Orientation of Shaft: | horizontal |
Generator:
Generator Manufacturer and Model: | OGI, LLC |
Phases: | 3 |
Potencial (nominal): | 20kW (30kvA) |
Nominal voltage: | 480 v, singlephase |
Nominal Speed: | 1800rpm |
Frequency: | 60 Hz |
Isolation Class: | H |
Mechanical Transmission / Coupling
Type of Belt: | Abasic plana |
Belt Manufacturer: | Central de Rodamiento |
Distance between Pulleys: | - |
Diameter of Generator Pulley: | - |
Diameter of Generator Pulley: | - |
Control System
Control System Manufacturer and Model: | Thomson and Howe Energy Systems, A2 |
Type of Control: | Load Control |
Capacity: | 30kW |
Electrical Transmission
Mini Grid: | yes |
Connection to national Grid: | no |
Grid Voltage: | 480V |
Diameter of Conductor: | 4x 1/0 |
Transformer Rating: | - |
Economic Information
Developer: (Contact: ) | |
Start of Construction: | |
Date of Commissioning: | |
Ownership / Operation Model: | |
Operator: | |
Tariff structure: | |
Connected Housholds: | 25 |
Connection Cost Cost to be covered by houshold: | |
Overall Project Costs: |