MHP Template

From energypedia
Revision as of 22:15, 27 March 2014 by ***** (***** | *****) (Created page with " = Overview<br/> = {| border="0" align="left" cellspacing="1" cellpadding="2" style="width: 600px;" |- | style="width: 194px;" | <span style="line-height: 18px;">Name of the ...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Overview

Name of the site:
Country:
Turbine Type:
Power Output:
Project Status:
Comments:





Operation Data

Gross Head:
Net/Design Head:
Flow (design flow):
Comments on flow variation during the year: Problems with flow during dry season.





Technical Information

Comments:


Civil Works and Penstock

Dam construction material: Concrete
Dam Dimensions:
Storage Volume Reservoir:
Sedimentation Basin material: Concrete
Sedimentation Basin Dimensions:
Penstock Length:
Penstock Diameter at Beginning:
Penstock Diameter at End:
Penstock Changes of Diameter:
Penstock Material:
Security Valve:

Electromechanical Equipment

Turbine

Turbine Type:
Turbine Diameter:
Turbine Material:
Turbine Manufacturer:
Potencial (nominal): 24 kW
Rated Head:
Rated Flow:
Rated Speed:
Runaway Speed:
Shaft diameter and material:
Direction of Rotation:
Orientation of Shaft:



Generator:

Generator Manufacturer and Model: Stamford
Phases:
Potencial (nominal):
Nominal voltage:
Nominal Speed:
Frequency:
Isolation Class:

Mechanical Transmission / Coupling

Type of Belt:
Belt Manufacturer:
Distance between Pulleys:
Diameter of Generator Pulley:
Diameter of Generator Pulley:

Control System

Control System Manufacturer and Model:
Type of Control:
Capacity:


Electrical Transmission

Mini Grid: yes
Connection to national Grid:
Grid Voltage:
Diameter of Conductor:
Transformer Rating:



Economic Information

Developer: (Contact: )
Start of Construction:
Date of Commissioning:
Ownership / Operation Model:
Operator:
Tariff structure:
Connected Housholds: 45
Connection Cost Cost to be covered by houshold:
Overall Project Costs:








Project Photos