Changuara/Chirodzo (Bernado Corneiro)

From energypedia
Revision as of 22:23, 18 October 2012 by ***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Mozambique |HPDBCity/Town=Messica, Changuara/Chirodzo, Manica |HPDBStream Name=Messica |HPDBOperator=Bernado Corneiro |HPDBAny Other Uses=to be assessed - own...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Back to the Hydropower Sites Database

General Information

Country: Mozambique
City/Town: Messica, Changuara/Chirodzo, Manica
Coordinates (Powerhouse):
Year of Commission:
Basin Name:
Stream Name: Messica
Developer:
Operator: Bernado Corneiro
Project Status:
Any other uses of the water source: to be assessed - owner works at Ifloma
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 6
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type:
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: Yes
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: