Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all.
Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.
Thank you for your support, your donation, big or small, truly matters!
TUEWAS Toolbox - Connection Agreement Solutions
Browse by Theme/Topic
Technical requirements for connection (grid codes, standards)
| ID Number | Year | Title | Author | Type of Entry | Main Category | Country | Location within Country | File | Reference project name | Journal or conference name | URL | Active management of distribution grid | Enabling distributing technologies | Market-based and Tariff-based solutions | Connection agreement solutions | Distribution planning | Operation and maintenance | Information exchange |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 7 | 2021 | Study on Project to Grid and Project to Project Interconnection of Micro Hydro | Practical Action Consulting Private Limited | Study Report | Distribution planning | No file uploaded. | Renewable Energy for Rural Areas II (RERA-II) project |
|
|
|
||||||||
| 9 | 2021 | Detailed Feasibility Study of Mini/Micro Hydropower Interconnected Mini Grid in Jumla | NEA Engineering Company Limited | Study Report | Distribution planning | Jumla | No file uploaded. | Renewable Energy for Rural Livelihood (RERL) |
|
|
|
|
|
|||||
| 14 | 2019 | Revision of Grid Code and Distribution Code for facilitating Variable Renewable Energy Integration – Final Report | Moeller & Poeller Engineering GmbH; VietnamMW Co., Ltd | Study Report | Connection agreement solutions | No file uploaded. | Smart Grids for Renewable Energy and Energy Efficiency |
|
|
|||||||||
| 16 | 2022 | Workshop Slides: Grid Integration of Grid-Connected Photovoltaics | Renewables Academy (RENAC) AG | Training Material | Enabling distributed technologies | No file uploaded. |
|
|
|
|
||||||||
| 20 | 2018 | International Review of Residential PV Feed-in Management | Electric Power Research Institute | Study Report | Active management of distribution grid | No file uploaded. | https://aemo.com.au/-/media/Files/Electricity/NEM/DER/2019/Standards-Protocols/EPRI-PV-Feed-in-Management-Report.pdf |
|
|
|
||||||||
| 22 | 2018 | Common Smart Inverter 8 Profile 9 IEEE 2030.5 Implementation Guide for Smart Inverters | Sunspec Common Smart Inverter Profile Working Group | Guidelines | Information exchange | No file uploaded. | SunSpec IEEE 2030.5 Conformance Profiles Work Group | https://sunspec.org/wp-content/uploads/2019/08/CSIPImplementationGuidev2.103-15-2018.pdf |
|
|
||||||||
| 39 | 2022 | Grid codes for renewable powered systems | International Renewable Energy Agency, Energynautics | Study Report | Connection agreement solutions | No file uploaded. | https://www.irena.org/publications/2022/Apr/Grid-codes-for-renewable-powered-systems |
|
|
|
||||||||
| 40 | 2019 | Highlights of IEEE Standard 1547-2018 | Narang, David (NREL) | Other | Connection agreement solutions | No file uploaded. | https://www.nrel.gov/docs/fy20osti/75436.pdf |
|
|
|||||||||
| 41 | 2019 | An Overview of Distributed Energy Resource (DER) Interconnection: Current Practices and Emerging Solutions | National Renewable Energy Laboratory | Study Report | Connection agreement solutions | No file uploaded. | https://www.nrel.gov/docs/fy19osti/72102.pdf |
|
|
|
|
|||||||
| 42 | n/a | Rule 21 Interconnection | State of California | Web Page | Connection agreement solutions | California | No file uploaded. | https://www.cpuc.ca.gov/rule21/ |
|
|
|
|||||||
| 45 | 2020 | PV Generation Hosting Capacity in Dominican Distribution Grids | Energynautics | Study Report | Distribution planning | No file uploaded. | https://transicionenergetica.do/2021/07/29/pv-generation-hosting-capacity-in-dominican-distribution-grids-full-study-available-in-english-now/ |
|
|
|
||||||||
| 46 | 2017 | Do It Locally: Local Voltage Support by Distributed Generation – A Management Summary | Fraunhofer IWES | Study Report | Distribution planning | No file uploaded. | IEA Task 14 Subtask 2 | https://iea-pvps.org/wp-content/uploads/2020/01/Task_14_Report__Do_It_Locally_IEA_Final_T14.08.pdf |
|
|
|
|||||||
| 62 | 2021 | Informative Background on the Interoperability Requirements in IEEE Std 1547-2018 | Ingram, Michael; Rasel Mahmud; David Narang; NREL | Study Report | Information exchange | No file uploaded. | https://www.nrel.gov/docs/fy21osti/77959.pdf |
|
|
|||||||||
| 88 | 2017 | Simulation of Hawaiian Electric Companies Feeder Operations with Advanced Inverters and Analysis of Annual Photovoltaic Energy Curtailment | National Renewable Energy Laboratory | Study Report | Enabling distributed technologies | Hawaii | No file uploaded. | Task No. WRHV.1000 | https://www.nrel.gov/docs/fy17osti/68681.pdf |
|
|
|
|
Interconnection application procedures
| ID Number | Year | Title | Author | Type of Entry | Main Category | Country | Location within Country | File | Reference project name | Journal or conference name | URL | Active management of distribution grid | Enabling distributing technologies | Market-based and Tariff-based solutions | Connection agreement solutions | Distribution planning | Operation and maintenance | Information exchange |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 7 | 2021 | Study on Project to Grid and Project to Project Interconnection of Micro Hydro | Practical Action Consulting Private Limited | Study Report | Distribution planning | No file uploaded. | Renewable Energy for Rural Areas II (RERA-II) project |
|
|
|
||||||||
| 9 | 2021 | Detailed Feasibility Study of Mini/Micro Hydropower Interconnected Mini Grid in Jumla | NEA Engineering Company Limited | Study Report | Distribution planning | Jumla | No file uploaded. | Renewable Energy for Rural Livelihood (RERL) |
|
|
|
|
|
|||||
| 41 | 2019 | An Overview of Distributed Energy Resource (DER) Interconnection: Current Practices and Emerging Solutions | National Renewable Energy Laboratory | Study Report | Connection agreement solutions | No file uploaded. | https://www.nrel.gov/docs/fy19osti/72102.pdf |
|
|
|
|
|||||||
| 42 | n/a | Rule 21 Interconnection | State of California | Web Page | Connection agreement solutions | California | No file uploaded. | https://www.cpuc.ca.gov/rule21/ |
|
|
|
|||||||
| 45 | 2020 | PV Generation Hosting Capacity in Dominican Distribution Grids | Energynautics | Study Report | Distribution planning | No file uploaded. | https://transicionenergetica.do/2021/07/29/pv-generation-hosting-capacity-in-dominican-distribution-grids-full-study-available-in-english-now/ |
|
|
|
||||||||
| 49 | 2017 | Optimizing the Grid: Regulator’s Guide to Hosting Capacity Analyses | Interstate Renewable Energy Council | Guidelines | Distribution planning | No file uploaded. | https://irecusa.org/resources/optimizing-the-grid-regulators-guide-to-hosting-capacity-analyses/ |
|
|
|
Compliance mechanisms
| ID Number | Year | Title | Author | Type of Entry | Main Category | Country | Location within Country | File | Reference project name | Journal or conference name | URL | Active management of distribution grid | Enabling distributing technologies | Market-based and Tariff-based solutions | Connection agreement solutions | Distribution planning | Operation and maintenance | Information exchange |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 39 | 2022 | Grid codes for renewable powered systems | International Renewable Energy Agency, Energynautics | Study Report | Connection agreement solutions | No file uploaded. | https://www.irena.org/publications/2022/Apr/Grid-codes-for-renewable-powered-systems |
|
|
|
||||||||
| 43 | 2021 | Introduction to the Compliance Process | NG Electricity System Operator | Guidelines | Connection agreement solutions | No file uploaded. | https://www.nationalgrideso.com/document/190686/download |
|
|
|||||||||
| 83 | n/a | Small-scale Renewable Energy Scheme inspections | Clean Energy Regulator of Australia | Web Page | Connection agreement solutions | No file uploaded. | https://www.cleanenergyregulator.gov.au/RET/Scheme-participants-and-industry/Agents-and-installers/Small-scale-Renewable-Energy-Scheme-inspections#Smallscale-Renewable-Energy-Scheme-inspection-results |
|
|
|



















