Micro Hydro Power (MHP) - Ethiopia, Gobecho I
From energypedia
Revision as of 14:15, 26 July 2011 by ***** (***** | *****)
Location of the site:
- Country: Ethiopia
- District: Arbegona
- River: Gange
- GPS Coordinates: 6º34’40’’N 38º41’50.3’’ E
Start of construction: at the beginning of 2009
Date of Commissioning: 26 Feb. 2010
Ownership / Operation Modell: Gobecho Genet Electric users cooperative/Community based cooperative Society
Tariff structure: Flat rate/monthly based per appliance
Turbine: T-3 Cross flow turbine/Locally manufactured
Generator: A.C. Synchronous Generator/ Power 10kW, 400v, 50hz, 1500r/min, 3 phase
Pictures and comments to be put here.