Micro Hydro Power (MHP) - Ethiopia, Gobecho I
From energypedia
Revision as of 13:12, 20 December 2010 by ***** (***** | *****)
Location of the site:
Country: Ethiopia
District: Bona Zuria
GPS Coordinates: 6º34’40’’N 38º41’50.3’’ E
Start of construction: at the beginning of 2009
Date of Commissioning: 26 Feb. 2010
Ownership / Operation Modell:
Gobecho Genet Electric users cooperative/Community based cooperative Society
Tariff structure:
Flat rate/monthly based per appliance
Turbine:
T-3 Cross flow turbine/Locally manufactured
Generator:
A.C. Synchronous Generator/ Power 10kW, 400v, 50hz, 1500r/min, 3 phase
Pictures and comments to be put here.