Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all. Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.


Donate now and support open access to energy expertise

Thank you for your support, your donation, big or small, truly matters!

Best Practice: Cogeneration in Palm Oil Industry in Honduras

From energypedia
Revision as of 14:27, 25 October 2016 by ***** (***** | *****)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Overview

In order to raise awareness of the promising cogeneration technology - also in the context of developing and emerging economies - this "best practice" example shall illustrate possible fields of application. Concretely, this article will give you a brief overview of a project in El Negrito, Honduras, where organic waste gas-fired cogeneration has been successfully integrated in a palm oil factory.  Information provided in this article is based on the Cogeneration & Trigeneration Guide [1] published by GIZ.

Technical detail of the implementation

HonduPalma, one of the leading palm oil manufacturers in Central America ordered a complete and highly efficient 1.2 MW 2GR biogas CHP cogeneration system. The fully integrated prime mover of the CHP System is a 2GR avusR 1200 with an MWMR core engine and a capacity of 1,200 kW el or 9,960 MWh p.a. electrical power and 1,225 kW th of thermal power. In addition to the CHP cogeneration unit, 2G CENERGY also supplied the complete gas treatment, including cooler, dryer / dehumidification, and the H2S removal system.

Benefits

The biogas energy conversion plant provides electricity to HonduPalma’s factory and oil processing facility, as well as feeding surplus electricity into the utility grid. The thermal energy is fully utilized in the palm oil processing facility.

Key Facts

Gas engine capacity


1,200 kWel

1,225 kWth

Fuel

Biogas

Fuel source

Anaerobic digestion of organic waste

Configuration

container module

Heat utilization

Thermal distribution to oil processing facility

electricity generation p.a.

9,960 MWh/a

Heat generation p.a

10,167 MW/a

Full load hours p.a.

8,300

Further Information

References

  1. DFIC - Dr. Fromme International Consulting, published by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH: "Cogeneration & Trigeneration - How to Produce Energy Efficiently", 2016, Eschborn, Germany, available here: https://www.giz.de/fachexpertise/html/13387.html