Jordan Energy Situation

From energypedia
Revision as of 13:52, 27 February 2015 by ***** (***** | *****) (→‎Renewable Energy Policy)
Jordan
Flag of Jordan.png
Location _______.png

Capital:

Amman

Region:

Coordinates:

31.9500° N, 35.9333° E

Total Area (km²): It includes a country's total area, including areas under inland bodies of water and some coastal waterways.

89,318

Population: It is based on the de facto definition of population, which counts all residents regardless of legal status or citizenship--except for refugees not permanently settled in the country of asylum, who are generally considered part of the population of their country of origin.

11,337,052 (2023)

Rural Population (% of total population): It refers to people living in rural areas as defined by national statistical offices. It is calculated as the difference between total population and urban population.

8 (2023)

GDP (current US$): It is the sum of gross value added by all resident producers in the economy plus any product taxes and minus any subsidies not included in the value of the products. It is calculated without making deductions for depreciation of fabricated assets or for depletion and degradation of natural resources.

50,813,642,349 (2023)

GDP Per Capita (current US$): It is gross domestic product divided by midyear population

4,482.09 (2023)

Access to Electricity (% of population): It is the percentage of population with access to electricity.

100.00 (2022)

Energy Imports Net (% of energy use): It is estimated as energy use less production, both measured in oil equivalents. A negative value indicates that the country is a net exporter. Energy use refers to use of primary energy before transformation to other end-use fuels, which is equal to indigenous production plus imports and stock changes, minus exports and fuels supplied to ships and aircraft engaged in international transport.

96.81 (2014)

Fossil Fuel Energy Consumption (% of total): It comprises coal, oil, petroleum, and natural gas products.

97.61 (2014)

Source: World Bank



Introduction

The Hashemite Kingdom of Jordan covers an area of 89,342 km² on the northern Arabian Peninsula. It borders with Syria, Israel, Iraq, Saudi Arabia and the West Bank (Palestine) as well as the Red Sea, with only 1.5% of its surface being arable land[1]. The climate is semi-dry in summer and cool in winter.

Energy Situation

Energy Data

Primary Energy Supply

Jordan has two main challenges regarding its energy situation: the growing energy demand on the one hand and the very limited domestic resources to fulfill this demand on the other hand. In 2013, the local production of energy – including crude oil, natural gas and renewable energy – was 272 ktoe (thousand tonnes of oil equivalent)[2], which was enough to cover only about 5% of the energy consumption.

Consumption

Final energy consumption in Jordan in 2012 added up to 5,013 ktoe. The share of the individual sectors is shown in table 1.

Table 1: Final energy consumption in Jordan in 2012 (ktoe)[3]


ktoe %
Industry sector 692 13.80
Transport sector 2,289 45.66
Other sectors 1,903 37.96
of which Residential 1,200 23.94

Commericial and public services 369 7.36

Agriculture/ Forestry 168 3.35

Non-specified 166 3.31
Non-energy use 130 2.59
Total 5,013 100


Import and Export

The limited domestic resources meant that Jordan had to import 7,656 ktoe (thousand tonnes of oil equivalent) of energy to meet its demands. This means that the cost of the consumed energy amounts to as much as 17% of the GDP[4].
In the past, one of the main sources of the imported energy was Egypt, from where Jordan imported natural gas. However, there have been problems of the service being disrupted, which caused enormous problems with regards to the energy security in Jordan. Therefore, Jordan has increased efforts to diversify its energy supply.

Subsidies

In 2012, the government of Jordan eliminated all fuel subsidies[5]. In 2014, Jordan’s finance minister stated that electricity subsidies will be eliminated by 2017[6].

►Go to Top

Renewable Energy

The use in Jordan of renewable energy sources has until now been marginal, accounting for a share of less than 1% of electricity generation. In 2012, of the 16.5 MW generated by renewable energy resources, 60.4% were hydropower, 21.1% biomass, 9.7% PV and 8.8% wind[7]. Potentials for generating power from renewable energy resources in the country are to be found primarily in the areas of wind and solar energy.

Wind Energy

Jordan has a number of regions that enjoy wind speeds suitable for generating electricity. Those regions with the greatest potential are located in the North and South of the country. A wind atlas, which was drawn up by the Danish Risø research centre in cooperation with the Jordanian authorities, has been available for Jordan since 1989. According to the Ministry of Energy and Mineral Resources, this wind atlas is in the process of being updated with results taken from recent measurements.
So far, two wind farms have been built and connected to the grid in Jordan. One has a generating capacity of 320 kW (4 x 80 kW) and was constructed in 1998, in cooperation with a Danish company, in Ibrahimyya near Hofa, as a pilot project. The second was completed in 1996 in Hofa (financed with funds from the German Eldorado programme) and has a capacity of 1.2 MW (5 x 225 kW). They generated around 3 GWh of electricity in 2012[8].The share of electricity from wind is supposed to significantly increase. In 2013, a contract was signed with a consortium of Jordanian and international companies for the 117 MW Tafila wind farm. It is supposed to increase the country's total power capacity by 3%, with commercial operation envisioned to start by mid-2015[9].
A second contract has been signed on an EPC (Engineering, Procurement and Construction) basis with the Spanish company Elecnor. This wind park in Maan, a city in the South of Jordan, is supposed to produce 33 x 2 MW and to start supplying energy by the end of 2015[10].

Solar Energy

In Jordan, natural conditions for solar are excellent, with an intensity of direct solar radiation with 5 to7 kWh/m²[11]. So far, solar PV has mainly been used for powering off-grid installations such as telecommunication towers, water pumping, and desalination of brackish water, as well as to provide dwellings in remote areas that are not connected to the electricity grid and where desalination had not been installed. Until the publication of the Renewable Energy Law in 2012, an estimated 236.4 kWp had been installed in Jordan[12].
In late April 2014, around 3 to 4 MW of PV systems had been installed on a decentralized level, with around 5 MW more under construction, all connected to the distribution grid under the net-metering scheme. It was estimated that more than 400 registered installation companies exist in Jordan, although only around 10 companies are actively doing business in the field for on-grid markets in early 2014. In addition, 12 projects with 170 MWp were to be constructed under the first round of Direct Proposals for PPAs that was initiated in October 2011. By April 2014 none of these projects had been realized yet, but negotiations were in their final stage, with financial closure to be accomplished by autumn 2014[13].
In addition, two tendered PV projects, one totaling 2 MWp, financed by Spain in the Azraq area, and another totaling 65 – 75 MWp in Quweirah (Aqaba), financed through a fund of Abu Dhabi, were to be evaluated by the Ministry for Energy and Mining Resources (MEMR) in 2014[14].

Hydropower

Jordan has no notable bodies of flowing water suitable for the construction of hydroelectric power stations. The only such plant is at the King Talal dam on the Az Zarqa River, with a capacity of 5 MW. Another hydroelectric generating facility employs a turbine to exploit the head of the cooling water taken from the sea to cool a thermal power station in Aqaba as it flows back to the sea. In 2012, these two stations together generated 61 GWh of electricity and were therefore the source of 0.4% of the electricity generated in the country as a whole.

Biogas

In cooperation with the United Nations Development Programme (UNDP), a project has been developed for utilising the methane gas that arises at the municipal waste disposal site in Amman. With the aid of the Global Environmental Facility (US$ 2.5 million) and the Danish development agency DANIDA (US$1.5 million), a biogas facility has been financed that captures the gases that arise at the landfill and uses a 1-MW generator to generate electricity for the interconnected power grid. The facility has been in service since 2000 and generates some 5 GWh of electricity annually. The installation is run by the Jordan Biogas Company, a joint stock company that is owned by the Central Electricity Generation Company (CEGCo) and the Greater Amman Municipality (GAM). Since 2001, the biogas sector has hardly been expanded, it produced about 6 GWh in 2012.

Biomass

Due to the arid climate, there is not a great deal of vegetation in Jordan. This obviously limits the potential use of vegetable biomass. The burning of vegetable biomass serves to a limited extent in rural regions for cooking and heating and is the main source of energy of the Bedouin in the desert. Great energy potential is to be found in household wastes (municipal solid wastes), which has an organic content of roughly 60%, and is estimated to add up to an annual total of 1.1 million tonnes. This equates to a daily per capita figure of between 0.35 and 0.95 kg of waste with a gross calorific value of 7-11 MJ/kg. The figures vary depending on the time of year and also differ between urban and rural regions.

Geothermal Energy

Geothermal resources in Jordan have been identified mainly in two regions. That said, both the sources on the eastern banks of the Jordan Valley and those on the plateau to the east of Madaba offer comparatively low temperatures below 100°C. This means they cannot be used to generate electricity and will continue to be used for thermal purposes only, such as for heating swimming pools and greenhouses.


Electricity

Installed Capacity and Generation

In 2013, the Jordanian interconnected power grid was supplied by an installed power station capacity of 3,193 MW[15]. The generated and imported electrical energy amounted to 17,643 GWh in the same year. The available capacity development by type of generation since 2010 is outlined in table 2.

Table 2: Available capacity development by type of generation (in MW) 2010-2013[15]


2010 2011 2012 2013
MW
Steam 925 925 925 791
Gas turbine (diesel) 149 134 134 27
Gas turbine (natural gas) 600 499 499 621
Combined cycle 1,317 1,737 1,737 1,737
Hydro Units 12 12 12 12
Wind Energy 1.4 1.4 1.4 1.4
Biogas 3.5 3.5 3.5 3.5

Total 3,008 3,312 3,312 3,193

In addition to the power stations operated by the public utilities, there are also a number of industrial enterprises that generate electricity in their own plants. Some of these also feed excess electricity into the Jordanian interconnected grid. Since the amount of electricity generated in Jordan has for some years been insufficient to cover the country’s needs, additional power used to be imported from Egypt and Syria. However, due to the circumstances in the region, import has been stalled completely (Syria, since 2012) or reduced (Egypt).[15]

Consumption

The main consumer of electricity in Jordan is the domestic sector (including government buildings) which accounts for 43% of the total consumption, followed by the industrial sector (24%). Overall consumption has been steadily increasing in the recent years. The development of the electricity consumption per sector is outlined in table 3.

Table 3: Electricity consumption by sector (GWh) 2008-2013[15]

Sector 2008 2009 2010 2011 2012 2013
GWh
Domestic (incl. government buildings) 4,459 4,888 5,225 5,667 6,126 2,265
Industrial 3,128 3,006 3,262 3,486 3,461 3,517
Commercial 1,925 1,980 2,187 2,173 2,427 2,414
Water Pumping 1,713 1,772 1,868 1,899 1,955 2,076
Street Lighting 284 310 315 310 305 291

Total 11,509 11,956 12,857 13,535 14,277 14,564


Grid

The Jordanian national interconnected grid transmits electricity from the power stations to the distribution substations and transformer substations in the various regions of the kingdom via 400-kV and 132-kV power lines. The star topography of the grid has a clearly identifiable north-south axis, along which the only 400-kV power line runs, from Aqaba in the south via Amman and up to the Syrian border. The only area in which the grid has a ring-shaped configuration is around the capital city. In the north, the power grid is connected to the Syrian grid by means of a 230-kV and a 400-kV power line. In the south, there is a 400-kV connection to the Egyptian grid. The interconnected grid feeds the local distribution systems via which almost the entire population of Jordan receives its electricity. The overall length of the installed high voltage power lines (132 kV and 400 kV) is around 3,400 km. The National Electric Power Company (NEPCO) is planning to develop a new high voltage transmission network, called “green corridor”, running South-North in order to reinforce the electric grid. The project was initially planned for 2015, but due to delays it seems that it will be not be operational before 2018[16].

Electricity Prices

The electricity tariff structure in Jordan takes into account social aspects as well as the economic capacities of consumers. In 2014, the electricity prices for the end consumer ranged from JD 0.033 per kWh for small residential consumers with less than 150 kWh per month demand to JD 0.292 per kWh for the banking sector. In 2012, the generation and distribution costs were JD 0.146 per kWh, whereas the average selling price was JD 0.0636 per kWh. The difference in price had to be covered by the state-owned National Electric Power Company (NEPCO), thereby creating a substantial deficit of JD 2.3 billion by the end of 2012. In order to reduce the losses, a National Strategic Plan has been developed. It foresees the adjustment of electricity tariffs and other measures to enhance the efficiency of the electricity system. By the end of 2017, NEPCO is supposed to be able to cover its costs. The plan prescribes the electricity price development for different consumer categories until the year 2017. Nevertheless, electricity is subsidized for many categories, e.g. for consumers with low electricity consumption[17].
The electricity tariff schedule for the period from 2013 to 2017 is available here: http://www.memr.gov.jo/LinkClick.aspx?fileticket=PHxs463H8U0=&tabid=255
►Go to Top

Energy Policy

General Information

More than 96% of energy resources have to be imported. That is why, from an economic point of view, it is important for NEPCO as well as for consumers paying high prices for energy to look for cheaper alternatives of electricity supply. This is especially true since the overall political situation in the region remains unstable, making the option of cheap gas or electricity imports less probable in the near to mid-range future. Alternative energy sources such as shale oil or nuclear power require at least several years of exploration and development activities before deployment, and the LNG terminal for gas in Aqaba is still under construction. A growing population and the corresponding increase in energy consumption require solutions that can quickly generate additional electricity capacities.[18]
►Go to Top

Renewable Energy Policy

As a general rule, the issuing of licenses is regulated by the General Electricity Law, Article 28 onwards. In conformance with this law, the regulatory authority issues licenses to firms that wish to generate, distribute or sell electricity. Generating plants with a capacity of up to one megawatt are allowed to operate without a license. Local supply networks with a capacity of max. 100 kW can be operated without a license, in the same way as power plants that are used solely to generate electricity for self-consumption. Power supply companies or middlemen who want to purchase electricity from a power station with a capacity greater than 5 MW may conclude appropriate supply contracts only after competing in a public tendering process (Article 35). These rules apply equally to conventional thermal power stations and stations that generate electricity from renewable energy sources.
To develop renewable energy capacities, a number of support mechanism have been introduced. For example, under the Jordanian net-metering scheme, the excess electricity fed into the grid is credited for later consumption. This excess electricity that is credited can be used to offset electricity used at other times, when there is little or no PV electricity production (e.g. at night). The legal basis for net-metering is the 2012 Renewable Energy and Energy Efficiency Law No. (13).
The Government has being attempting for a long time now to conclude contracts with Independent Power Producers (IPP) with the aim of expanding the number of power stations in Jordan’s electricity generating system. Initially, it made only slow progress. A number of potential projects were abandoned. Now, two IPP projects (combined cycle) have been implemented. The IPP model is also used for renewable energy plants. However, by June 2014, no renewable energy plants had been constructed under the first round of the tender scheme and the following two rounds of direct proposals. In the first round, initiated in 2011, PPAs covering 170 MWp of solar PV were initially signed between 12 IPP companies or consortia and the Ministry for Energy and Mining Resources (MEMR). Until April 2014, these were in the process of financial negotiations between investors and the potential IPPs. Those systems were due to be constructed and connected to National Electric Power Company’s (NEPCO) transmission lines within the next 16 months. In the following two rounds of direct proposals, another 400 MWp of solar PV systems had been tendered for direct proposals, including four 50 MW plants and two 100 MW plants.[19]
In 2007, Jordan updated its Master Strategy for Energy for the period of 2007 to 2020, which had initially been drafted in 2004. The strategy aims at reducing energy imports through diversification of the energy mix by using local resources such as shale oil, nuclear power and renewable energies. Although at the moment the strategy still serves as a guideline for renewable energies, its assumptions can be considered to be outdated, especially since it assumes that nuclear and shale oil will cover a considerable share of Jordan’s energy demand by 2015 and 2020.[20]


Energy Efficiency Policy

In the Master Strategy for Energy in Jordan for the period of 2007 to 2020 there are also several recommendation concerning energy efficiency. These include the implementation of energy consumption efficiency programs in different sectors, broad awareness campaigns on the energy consumption rationalization, tax exemptions for energy saving equipment, thermal insulation of buildings and a national award in the energy consumption rationalization domain.
Jordan also introduced a National Energy Efficiency Action Plan (NEEAP) which is in the process of adoptation. The NEEAP gives an national indicative target of 20% energy reductions by 2020 and six sectorial targets.
►Go to Top

Key Actors in the Energy Sector

Power Generating Companies

Central Electricity Generating Company (CEGCo)
This joint stock company, which has existed in its present form since 1999, operates the majority of Jordan’s power stations. In 2005, 94% of the electricity generated inside Jordan came from CEGCo power stations. All of the electricity the company generates is sold to NEPCo, which, alongside the Jordanian Government that itself holds 75% of CEGCo’s shares, is the only other shareholder of the national power provider.
Samra Electric Power Generating Company (SEPGCo)
This joint stock company was founded in 2003 and is 100% owned by the Jordanian state. It is responsible for running the combined-cycle power station in Al-Risha. In 2005, the Ministry of Energy and Mineral Resources awarded SEPGCo the contact to build another 100-MW steam power plant. The Jordanian Government is planning to privatise the company as part of an international tendering process.
►Go to Top

Power Transmission Companies

National Electric Power Company (NEPCo)
The national power company, National Electric Power Company (NEPCo), is a joint stock corporation whose capital is completely in the hands of the Jordanian state. It is responsible for expanding and operating the nationwide transmission network. NEPCo purchases the electricity from the producers as the sole buyer, in order to sell it on to the operators of the distribution networks. The company operates a national load-dispatching centre to coordinate the demand for and the supply of power.
►Go to Top

Distribution Companies

Jordan Electric Power Company (JEPCo) In 2005, the distribution company supplied power to around 739,000 end customers in the four governorates Amman (capital), Zarqa, Madaba and Balqa. This added up to 4,793 GWh or 55% of the electricity consumed nationwide. The company was founded in 1947 as a joint stock company. The 50-year concession to generate and distribute electricity for the above-mentioned governorates, on which JEPCo’s business is based, is due to expire in 2012.
Irbid District Electricity Company (IDECo)
In 2005, this distribution company supplied power to around 251,000 customers in the four governorates Irbid, Mafraq, Jerash and Ajlun in the north of the country (1,210 GWh). Around 14% of the electricity consumed in Jordan was distributed to end customers via IDECo’s network. IDECo’s concession runs out sooner than JEPCo’s, in 2011. IDECo was established in 1961 as a privately owned power supply (distribution) company. So far, NEPCo still holds 55 % of the shares in the company, but it wants to sell these as part of a further phase of privatisation of the power supply sector.
Electricity Distribution Company (EDCo)
In those regions of the country for which neither JEPCo nor IDECo have a concession, end customers are supplied with their electricity by EDCo. In 2005 this amounted to 139,000 customers, receiving 1,427GWh or just over 16% of Jordan’s total consumption. EDCo came into being as a power supply company when the Jordanian electricity authority began to be unbundled. The company is state owned and is intended to be sold off within the scope of privatisation of the sector. ►Go to Top

Ministry of Energy and Mineral Resources (MEMR)

The Ministry of Energy and Mineral Resources (MEMR) lays down the goals and political framework conditions for development of the energy market. Its core task is to facilitate continuing development of the country by ensuring adequate availability of energy. This is meant to be brought about with as little expenditure as possible, but while maintaining high standards. To this end, the ministry also intends inviting foreign investors in the fields of power generation, oil production and the development of other locally available sources of energy.
►Go to Top

Electricity Sector Regulatory Commission

This independent institution established in 2001 has a whole range of tasks. On the one hand it fixes the electricity tariffs and the charges for services related to the sale of electricity. On the other hand it awards licences to power providers and distributors and monitors compliance with the terms of the licences. Furthermore, the commission has been set up to arbitrate between operators and electricity customers in order to find solutions that are as amicable as possible. It also has the job of mediating between power generators or operators of distribution networks in the event of disagreement.
The overriding principle to be followed by the commission in all matters relating to the electricity sector is to ensure the interests of the public at large are looked after. To this end, it can both assume an advisory role as well as make public statements.
►Go to Top

National Energy Research Center (NERC)

The NERCwas established in 1998 with the goal of promoting scientific research in the fields of renewable energy sources and efficient energy use. Furthermore, the centre also has the task of exploring possibilities of using the oil shale that is readily available in Jordan to produce energy. And the final responsibilities of this establishment are in the fields of training and the transfer of technology in the above-mentioned research areas. The NERC cooperates with among others the Ministry of Energy and Mineral Resources (MEMR), the Royal Scientific Society and the Natural Resources Authority. The energy minister also holds the position of chairman of the centre.
►Go to Top

International Donor Activities

In 2004, the Jordanian Government submitted an application for a US$ 6 million grant from the Global Environment Facility (GEF/World Bank) for a development project in the field of wind power. Part of the remit of this “Promotion of a Wind Power Market Project” is to eliminate obstacles that stand in the way of the commercial use of wind power in Jordan. The aim on the one hand is to improve the legislative and administrative preconditions for the use of renewable energy resources. On the other hand, the project is also to comprise the construction of a 60-MW wind farm that is to financed by private investors. So far, however, only US$ 350,000 has been approved for feasibility studies.
Since 2005, the Japanese Government, together with the Jordanian Government, has been sponsoring four studies investigating the potentials of renewable energy resources in Jordan within the framework of the “Policy and Human Resources Development Fund” (PHRD) of the World Bank. The Japanese share amounts to US$ 1 million, while Jordan is contributing a further US$ 312,000. One particular focus here too is on the wind power segment. Furthermore, the United States Trade and Development Agency (USTDA) is funding (US$ 180,000) a feasibility study into the expansion of the existing wind farms in Hofa and Al-Ibrahimiya. ►Go to Top

Publications

En-windenergy-jordan-study-2007.pdf Enabling_PV_in_the_MENA_Region_-_Jordan.pdf

Further Information

►Go to Top

References

  1. GIZ (2014): Enabling PV in the MENA Region. The Emerging PV Market in Jordan.
  2. http://www.iea.org/statistics/statisticssearch/report/?country=JORDAN&product=balances&year=2012
  3. http://www.iea.org/statistics/statisticssearch/report/?country=JORDAN&product=balances&year=2012
  4. http://www.memr.gov.jo/LinkClick.aspx?fileticket=B495BBqcNs4%3d&tabid=111
  5. http://www.economist.com/news/finance-and-economics/21639589-few-countries-are-taking-advantage-lower-oil-prices-cut-subsidies-pump
  6. http://www.aawsat.net/2014/05/article55332275/jordans-finance-minister-we-will-eliminate-electricity-subsidies-by-2017
  7. http://www.rcreee.org/sites/default/files/jordan_fact_sheet_re_print.pdf
  8. http://www.iea.org/statistics/statisticssearch/report/?year=2012&country=JORDAN&product=RenewablesandWaste
  9. http://www.memr.gov.jo/LinkClick.aspx?fileticket=B495BBqcNs4%3d&tabid=111
  10. http://www.rechargenews.com/wind/1370753/Elecnor-Gamesa-in-Jordan-wind-joy
  11. http://www.memr.gov.jo/LinkClick.aspx?fileticket=B495BBqcNs4%3d&tabid=111
  12. GIZ (2014): Enabling PV in the MENA Region. The Emerging PV Market in Jordan.
  13. GIZ (2014): Enabling PV in the MENA Region. The Emerging PV Market in Jordan.
  14. GIZ (2014): Enabling PV in the MENA Region. The Emerging PV Market in Jordan.
  15. 15.0 15.1 15.2 15.3 http://www.nepco.com.jo/store/docs/web/2013_en.pdf
  16. http://www.invest-export.irisnet.be/documents/16349/1140680/2014+-Jordan+-+Renewable+energy+prospects.pdf/eb6cb1ff-a6d9-4d7c-804f-13b68877d86d
  17. GIZ (2014): Enabling PV in the MENA Region. The Emerging PV Market in Jordan.
  18. GIZ (2014): Enabling PV in the MENA Region. The Emerging PV Market in Jordan.
  19. GIZ (2014): Enabling PV in the MENA Region. The Emerging PV Market in Jordan.
  20. GIZ (2014): Enabling PV in the MENA Region. The Emerging PV Market in Jordan.


►Go to Top