Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all. Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.


Donate now and support open access to energy expertise

Thank you for your support, your donation, big or small, truly matters!

Gobecho I

From energypedia
Revision as of 08:13, 3 September 2012 by ***** (***** | *****)


Back to the Hydropower Sites Database

General Information

Country: Ethiopia
City/Town: District: Bona
Coordinates (Powerhouse): The following coordinate was not recognized: 6º34’40’’N, 38º41’50.3’’ E.The following coordinate was not recognized: 6º34’40’’N, 38º41’50.3’’ E.
Year of Commission:
Basin Name:
Stream Name: Gange
Developer:
Operator: Gobecho Genet Electric users cooperative/Community based cooperative Society
Project Status:
Any other uses of the water source:
Contact:
Comment:
Link to Photos: https://energypedia.info/index.php/MHP_Gobecho_I

Technical Information

Power: (kW) 7
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: cross flow turbine (T-3)
Turbine Manufacturer: SELAM
Generator Type: Synchronous
Generator Capacity (kW): 10kW
Generator Manufacturer:
Comment: A.C. Synchronous Generator/ Power 10 kW, 400 V, 50 Hz, 1500r/min, 3 phase

Mini/Island Grid Information

Mini Grid: Yes
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage: GIZ EnDev
Tariff Levels: Flat rate/monthly based per appliance
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown:


further information: https://energypedia.info/index.php/File:Fact_sheet_Gobecho.pdf