Example: EnDev Senegal

Costs

Hybrid mini-grids would be cost-efficient without subsidies if the poorest segment of the population could pay 4,700 to 5,000 FCFA (7-8 EUR).

If the payment capacity is lower than that of the ‘optimal’ village, the supply should be limited to two or three, instead of four service levels, which better correspond to the group needs of the middle income segment. Fulfilling energy needs of the richest segment results in a considerable reduction of the profitability index.

If no investors are motivated to participate in the projects after these last considerations, then management lead by communal associations, which focus more on the benefits electrification, will reduce the amount of profit required and consequently the subsidies needed.

EnDev provides a subsidy of 70% of the initial investment costs. The operator and the rural commune contribute 20% to the initial investment, whereby the operator usually contributes 15% by providing services and logistics. The remaining 5% is covered by the commune mainly through treasury bills and the provision of manpower for the construction sites. The end-users pay 10% consisting of a connection fee and the reimbursment of pre-financed indoor installations.


Tariff Setting

The project suggested the tariffs to be aproved by the Regulatory Commision for the Electricity Sector. The calculation is equally based on socio-economic studies conducted in the intervention region as well as on the operator's business plan.

The end-users pay a connection fee in the beginning and a monthly fee for the electricity provided. A part of the costs for the indoor installations is pre-financed by the operator and has to be reimbursed by the end-user through a addition to the monthly payment within the first two or three years depending on the service level considered.


PV-diesel hybrid mini-grid Level 1 (FCFA) Level 2 (FCFA) Level 3 (FCFA) Level 4 (FCFA)
Connection Fee 20,000 37,500 65,000 100,000
Monthly Payment during the first Years 6,100 10,000 16,500 fix part: 16,000
variable part: 139 FCFA/kWh
Payment Period for the Indoor Installations 2 years 2 years 3 years 3 years
Monthly Payment after Payment for the Indoor Installations 4,000 7,500 13,000 fix part: 11,300
variable part: 139 FCFA/kWh


In the first three serivce levels the monthly payment rate is fixed. Only for the fourth level electricity consumption is metered and a part of the fee hast to be payed according to consumption.



⇒ Back to Solar Section