MHP La Laguna
From energypedia
Overview
Name of the site: | El Plan |
Country: | Nicaragua (GPS Coordinates: ?) |
Turbine Type: | Pelton |
Power Output: | 24 kW |
Project Status: | in operation |
Comments: | - |
Operation Data
Gross Head: | 200m |
Net/Design Head: | 200m |
Flow (design flow): | 20 l/s |
Comments on flow variation during the year: | Problems with flow during dry season. |
Technical Information
Comments: | General Technical Comments on the Project |
Civil Works and Penstock
Dam construction material: | Concrete |
Dam Dimensions: | |
Storage Volume Reservoir: | |
Sedimentation Basin material: | Concrete |
Sedimentation Basin Dimensions: | |
Penstock Length: | |
Penstock Diameter at Beginning: | |
Penstock Diameter at End: | |
Penstock Changes of Diameter: | |
Penstock Material: | PVC |
Security Valve: |
Electromechanical Equipment
Turbine
Turbine Type: | Pelton, 1 injector |
Turbine Diameter: | |
Turbine Material: | |
Turbine Manufacturer: | Nica Bosch (Contact: company does not exist any more) |
Potencial (nominal): | 24 kW |
Rated Head: | |
Rated Flow: | |
Rated Speed: | |
Runaway Speed: | |
Shaft diameter and material: | |
Direction of Rotation: | clockwise |
Orientation of Shaft: | horizontal |
Generator:
Generator Manufacturer and Model: | Stamford |
Phases: | 3 |
Potencial (nominal): | |
Nominal voltage: | |
Nominal Speed: | |
Frequency: | 60 Hz |
Isolation Class: |
Mechanical Transmission / Coupling
Type of Belt: | |
Belt Manufacturer: | |
Distance between Pulleys: | |
Diameter of Generator Pulley: | |
Diameter of Generator Pulley: |
Control System
Control System Manufacturer and Model: | Thomson and Howe Energy Systems, J2 |
Type of Control: | Load Control |
Capacity: |
Electrical Transmission
Mini Grid: | yes |
Connection to national Grid: | no |
Grid Voltage: | |
Diameter of Conductor: | |
Transformer Rating: |
Economic Information
Developer: (Contact: ) | |
Start of Construction: | |
Date of Commissioning: | |
Ownership / Operation Model: | |
Operator: | |
Tariff structure: | |
Connected Housholds: | 25 |
Connection Cost Cost to be covered by houshold: | |
Overall Project Costs: |
Project Photos