Jatiluhur

From energypedia
Revision as of 08:10, 3 September 2012 by ***** (***** | *****)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Back to the Hydropower Sites Database

General Information

Country: Indonesia
City/Town: Jatimekar
Coordinates (Powerhouse): 6° 31' 22.80" S, 107° 23' 20.40" E
Year of Commission: 1967
Basin Name:
Stream Name: Citarum River
Developer:
Operator: PT PLN (Persero)
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 150,000
Energy (kWh/a): 790,000,000
Capacity Factor (%): 14.5
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type:
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment: Regional Grid - PT PLN (Persero)

Dam Information

Dam Type:

Embankment on Rockfill
Dam Construction Material:
Dam Height [m]: 105
Length of Dam [m]: 1200
Storage Volume of Reservoir (m³): 3,430,000,000
Flood Storage of Reservoir:
Channel Material:
Comment: 140,000,000m lost to sedimentation

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: