Difference between revisions of "Carbon Markets for Small Hydro Power"
From energypedia
***** (***** | *****) |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
− | = | + | [[Portal:Hydro|►Back to Hydro Portal]] |
+ | |||
+ | = Overview = | ||
*[http://cdm.unfccc.int/about/index.html General information on carbon finance (Clean Develooment Mechanism (CDM) and Voluntary Carbon Markets (VCMs))] | *[http://cdm.unfccc.int/about/index.html General information on carbon finance (Clean Develooment Mechanism (CDM) and Voluntary Carbon Markets (VCMs))] | ||
− | + | <br/> | |
= Selected Small Hydro Power Carbon Finance Projects = | = Selected Small Hydro Power Carbon Finance Projects = | ||
Line 20: | Line 22: | ||
<br/> | <br/> | ||
+ | <br/> | ||
= Selected Studies and Materials = | = Selected Studies and Materials = | ||
Line 30: | Line 33: | ||
<br/> | <br/> | ||
− | |||
− | |||
= Further Information = | = Further Information = | ||
− | *[[ | + | *[[Clean_Development_Mechanism_(CDM)|Clean Development Mechanism (CDM)]]<br/> |
+ | <br/> | ||
= References = | = References = | ||
− | + | [[Category:Carbon_Market]] | |
− | + | [[Category:Clean_Development_Mechanism_(CDM)]] | |
+ | [[Category:Voluntary_Carbon_Market_(VCM)]] | ||
+ | [[Category:Financing_Hydropower]] | ||
+ | [[Category:Financing_and_Funding]] | ||
[[Category:Hydro]] | [[Category:Hydro]] | ||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 10:17, 14 August 2014
Overview
Selected Small Hydro Power Carbon Finance Projects
- CDM PoA Small Hydro Power Generation in Indonesia: GTZ-supported PoA in cooperation with SouthPole.
- Phu Mau hydropower project (Vietnam): small scale run-of-river hydropower plant; three cascades with a total installed capacity of 5.6 MW. Crediting period 05 Jun 09 - 04 Jun 16.
- Sichuan provincial Longchi & Caoyuan Small-scale Hydro Power Bundle Project (China): two small-scale hydro projects - Longchi 5 MW + Caoyuan 4MW. Crediting period 28 Apr 09 - 27 Apr 16.
- Iruttukanam Small Hydro Electric Project (India): small scale run-of-river, 3 MW. Crediting period 01 Jun 09 - 31 May 19.
- e7 Bhutan Micro Hydro Power CDM Project (Bhutan): power generation capacity 70 kW. Crediting period 19 Aug 05 - 18 Aug 12.
- Sanquhar and Delta Small Hydro Power Projects (Sri Lanka): two small-scale, run of river hydropower plants, each with an installed capacity of 1.6 MW. Crediting period 01 Jan 04 - 31 Dec 10.
- Santa Lúcia II Small Hydropower Plant (Brazil): run-of-river small hydro plant with installed capacity of 7.6 MW. Crediting period 01 Oct 03 - 30 Sep 10.
- Feasibility of CDM as a financing model (Case studies from Ethiopia)
- Masca Small Hydro Programme (Honduras):PoA small scale, run-of-river hydropower plants, installed capacity between 0.7 - 2.3 MW.Crediting period 01 Sep 2011-31 Aug 2018 (renewable)
Selected Studies and Materials
- KfW PoA Blueprint Book 2nd Edition - Includes a section on PoA issues for small hydro power
- Experiences from the Small Hydro Power PoA in Indonesia - Presentation by Mirka Bodenbender (26.06.2010)
- A Guide to CDM and Family Hydro Power
- CDM Methodology Booklet-UNFCCC - This document summarizes each approved methodology into just one page that includes a diagrammatic representation.
- Analysis of the potential to foster electricity and lighting access in the Andean region, thanks to carbon mechanism - Microsol and Rexel Foundation, study led from June 2013 to May 2014.
Further Information