Difference between revisions of "Cirata"
From energypedia
***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Indonesia |HPDBCoordinates=Latitude= -6.7, Longitude= 107.3676 |HPDBDate of Commission=1988 |HPDBStream Name=Citarum |HPDBOperator=PT Pembangkitan Jawa-Bali ...") |
***** (***** | *****) |
||
Line 2: | Line 2: | ||
|HPDBCountry=Indonesia | |HPDBCountry=Indonesia | ||
|HPDBCoordinates=Latitude= -6.7, Longitude= 107.3676 | |HPDBCoordinates=Latitude= -6.7, Longitude= 107.3676 | ||
− | |HPDBDate of Commission=1988 | + | |HPDBDate of Commission=1988 |
|HPDBStream Name=Citarum | |HPDBStream Name=Citarum | ||
− | |HPDBOperator=PT Pembangkitan Jawa-Bali | + | |HPDBOperator=PT Pembangkitan Jawa-Bali |
+ | |HPDBProject Status=Completed | ||
|HPDBPower=1,008,000 | |HPDBPower=1,008,000 | ||
|HPDBEnergy=1,426,000,000 | |HPDBEnergy=1,426,000,000 |
Revision as of 12:24, 31 July 2012
Back to the Hydropower Sites Database
General Information
Country: | Indonesia |
---|---|
City/Town: | |
Coordinates (Powerhouse): | The following coordinate was not recognized: Latitude= -6.7, Longitude= 107.3676.The following coordinate was not recognized: Latitude= -6.7, Longitude= 107.3676. |
Year of Commission: | 1988 |
Basin Name: | |
Stream Name: | Citarum |
Developer: | |
Operator: | PT Pembangkitan Jawa-Bali |
Project Status: | Completed |
Any other uses of the water source: | |
Contact: | |
Comment: | |
Link to Photos: |
Technical Information
Power: (kW) | 1,008,000 |
---|---|
Energy (kWh/a): | 1,426,000,000 |
Capacity Factor (%): | 16.14 |
Penstock Diameter (mm): | |
Penstock Length (m): | |
Penstock Material (m³/s): | |
Maximum Flow of the Penstock (m³/s): | |
Minimum Flow of the Stream (m³/s): | |
Head (m): | |
Turbine Type: | Fracis turbines |
Turbine Manufacturer: | VA TECH HYDRO |
Generator Type: | |
Generator Capacity (kW): | |
Generator Manufacturer: | |
Comment: |
Mini/Island Grid Information
Mini Grid: | No |
---|---|
Load Control Information: | |
Connection Type: | |
Public Lighting: | |
Length of Transmission Line (m): | |
Voltage (v): | |
Transmission Conductor (type) : | |
Diameter of Conductor (mm²): | |
Transformer Rating (kVA): | |
Link to Grid: | |
S.W.E.R: | |
Operational Period (Xdays/year): | |
Comment: | Regional Grid - PT PLN (Persero) |
Dam Information
Dam Type: |
Embankment on Rockfill |
---|---|
Dam Construction Material: | Rock-fill Dam with Concrete Facing |
Dam Height [m]: | 112.5 |
Length of Dam [m]: | |
Storage Volume of Reservoir (m³): | 2,165,000,000 |
Flood Storage of Reservoir: | |
Channel Material: | |
Comment: |
Economic Information
Cost (€): | |
---|---|
Donor/Financier & Percentage: | |
Tariff Levels: | |
Connected Households: | |
Connection Cost (€): | |
Cost to be Covered by Households (%): | |
Comment: | |
Link to Cost Breakdown: |