***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Rwanda |HPDBCity/Town=Mukungwa |HPDBCoordinates=Latitude : -01.5378 Longitude : 29.6842 |HPDBDate of Commission=1982/??/?? |HPDBStream Name=Nyabarongo River |...") |
***** (***** | *****) |
||
| Line 5: | Line 5: | ||
|HPDBDate of Commission=1982/??/?? | |HPDBDate of Commission=1982/??/?? | ||
|HPDBStream Name=Nyabarongo River | |HPDBStream Name=Nyabarongo River | ||
| + | |HPDBProject Status=Completed | ||
|HPDBPower=12000 | |HPDBPower=12000 | ||
|HPDBMini Grid=No | |HPDBMini Grid=No | ||
|HPDBDam Type=Run of river | |HPDBDam Type=Run of river | ||
}} | }} | ||
Revision as of 13:39, 17 July 2012
Back to the Hydropower Sites Database
General Information
| Country: | Rwanda |
|---|---|
| City/Town: | Mukungwa |
| Coordinates (Powerhouse): | The following coordinate was not recognized: Latitude : -01.5378 Longitude : 29.6842.The following coordinate was not recognized: Latitude : -01.5378 Longitude : 29.6842. |
| Year of Commission: | 1982/??/?? |
| Basin Name: | |
| Stream Name: | Nyabarongo River |
| Developer: | |
| Operator: | |
| Project Status: | Completed |
| Any other uses of the water source: | |
| Contact: | |
| Comment: | |
| Link to Photos: |
Technical Information
| Power: (kW) | 12000 |
|---|---|
| Energy (kWh/a): | |
| Capacity Factor (%): | |
| Penstock Diameter (mm): | |
| Penstock Length (m): | |
| Penstock Material (m³/s): | |
| Maximum Flow of the Penstock (m³/s): | |
| Minimum Flow of the Stream (m³/s): | |
| Head (m): | |
| Turbine Type: | |
| Turbine Manufacturer: | |
| Generator Type: | |
| Generator Capacity (kW): | |
| Generator Manufacturer: | |
| Comment: |
Mini/Island Grid Information
| Mini Grid: | No |
|---|---|
| Load Control Information: | |
| Connection Type: | |
| Public Lighting: | |
| Length of Transmission Line (m): | |
| Voltage (v): | |
| Transmission Conductor (type) : | |
| Diameter of Conductor (mm²): | |
| Transformer Rating (kVA): | |
| Link to Grid: | |
| S.W.E.R: | |
| Operational Period (Xdays/year): | |
| Comment: |
Dam Information
|
Dam Type: |
Run of river |
|---|---|
| Dam Construction Material: | |
| Dam Height [m]: | |
| Length of Dam [m]: | |
| Storage Volume of Reservoir (m³): | |
| Flood Storage of Reservoir: | |
| Channel Material: | |
| Comment: |
Economic Information
| Cost (€): | |
|---|---|
| Donor/Financier & Percentage: | |
| Tariff Levels: | |
| Connected Households: | |
| Connection Cost (€): | |
| Cost to be Covered by Households (%): | |
| Comment: | |
| Link to Cost Breakdown: |