Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all.
Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.
Thank you for your support, your donation, big or small, truly matters!
Difference between revisions of "Tana Beles"
***** (***** | *****) |
***** (***** | *****) |
||
| Line 6: | Line 6: | ||
|HPDBBasin Name=Tana Lake | |HPDBBasin Name=Tana Lake | ||
|HPDBStream Name=Tana Lake | |HPDBStream Name=Tana Lake | ||
| − | |HPDBOperator=Ethiopian national grid | + | |HPDBOperator=Ethiopian national grid |
|HPDBProject Status=Completed | |HPDBProject Status=Completed | ||
| − | |HPDBPower= | + | |HPDBPower=460.000 |
| − | |HPDBEnergy= | + | |HPDBEnergy=1.720.000.000 |
|HPDBCapacity Factor=42 | |HPDBCapacity Factor=42 | ||
|HPDBHead=350 | |HPDBHead=350 | ||
| Line 16: | Line 16: | ||
|HPDBMini Grid=No | |HPDBMini Grid=No | ||
|HPDBDam Type=Dam on lake | |HPDBDam Type=Dam on lake | ||
| − | |HPDBStorage Volume of Reservoir= | + | |HPDBStorage Volume of Reservoir=9.120.000.000 |
|HPDBCost=477,586,503 | |HPDBCost=477,586,503 | ||
}} | }} | ||
Revision as of 12:50, 13 July 2012
Back to the Hydropower Sites Database
General Information
| Country: | Ethiopia |
|---|---|
| City/Town: | Tana Lake, Amhara |
| Coordinates (Powerhouse): | The following coordinate was not recognized: Latitude= 11.8196, Longitude= 36.9181.The following coordinate was not recognized: Latitude= 11.8196, Longitude= 36.9181. |
| Year of Commission: | 2010 |
| Basin Name: | Tana Lake |
| Stream Name: | Tana Lake |
| Developer: | |
| Operator: | Ethiopian national grid |
| Project Status: | Completed |
| Any other uses of the water source: | |
| Contact: | |
| Comment: | |
| Link to Photos: |
Technical Information
| Power: (kW) | 460.000 |
|---|---|
| Energy (kWh/a): | 1.720.000.000 |
| Capacity Factor (%): | 42 |
| Penstock Diameter (mm): | |
| Penstock Length (m): | |
| Penstock Material (m³/s): | |
| Maximum Flow of the Penstock (m³/s): | |
| Minimum Flow of the Stream (m³/s): | |
| Head (m): | 350 |
| Turbine Type: | |
| Turbine Manufacturer: | Francis |
| Generator Type: | VA Tech Hydro |
| Generator Capacity (kW): | |
| Generator Manufacturer: | |
| Comment: |
Mini/Island Grid Information
| Mini Grid: | No |
|---|---|
| Load Control Information: | |
| Connection Type: | |
| Public Lighting: | |
| Length of Transmission Line (m): | |
| Voltage (v): | |
| Transmission Conductor (type) : | |
| Diameter of Conductor (mm²): | |
| Transformer Rating (kVA): | |
| Link to Grid: | |
| S.W.E.R: | |
| Operational Period (Xdays/year): | |
| Comment: |
Dam Information
|
Dam Type: |
Dam on lake |
|---|---|
| Dam Construction Material: | |
| Dam Height [m]: | |
| Length of Dam [m]: | |
| Storage Volume of Reservoir (m³): | 9.120.000.000 |
| Flood Storage of Reservoir: | |
| Channel Material: | |
| Comment: |
Economic Information
| Cost (€): | 477,586,503 |
|---|---|
| Donor/Financier & Percentage: | |
| Tariff Levels: | |
| Connected Households: | |
| Connection Cost (€): | |
| Cost to be Covered by Households (%): | |
| Comment: | |
| Link to Cost Breakdown: |