== Capacity building measures - overview<br>  ==
+
== Capacity building measures - overview<ref>parts of content from: GTZ (n.D.): ToR - Leistungsbeschreibung  Windmessungen und Windpotentialbestimmung (1. Messphase) Anhang A_ToR 1. Messphase. Eschborn</ref><br>  ==
  
 
for instance:  
 
for instance:  
Line 9: Line 9:
 
*on-the-job e.g. feasibility studies, analysis of wind data&nbsp;<br>
 
*on-the-job e.g. feasibility studies, analysis of wind data&nbsp;<br>
  
== Class-room and on the job training: Wind data measurements<br> ==
+
== Class-room and on the job training: Wind data measurements<br> ==
  
The first phase of measurment of wind data should be accompanied by training measures for partner/local experts/staff. <br>
+
The first phase of measurment of wind data should be accompanied by training measures for partner/local experts/staff. <br>  
  
 
Content of the trainings should be (among others):  
 
Content of the trainings should be (among others):  
  
*General introduction into wind energy utilization and -technology<br>
+
*General introduction into wind energy utilization and -technology<br>  
*approach and criteria for site selection<br>
+
*approach and criteria for site selection<br>  
*methods and instruments for wind data measurement<br>
+
*methods and instruments for wind data measurement<br>  
*maintenance of measurement equipment and reading of data <br>
+
*maintenance of measurement equipment and reading of data <br>  
 
*analysis of wind data<br>
 
*analysis of wind data<br>
  
At the end of the training phase, the impacts should be evaluated, e.g. because of an "examination" (test). (cp. also [[M&E_-_Wind_Energy|Monitoring]]) <br>
+
At the end of the training phase, the impacts should be evaluated, e.g. because of an "examination" (test). (cp. also [[M&E - Wind Energy|Monitoring]]) <br>  
  
=== Wind measurement &lt;10m ===
+
=== Wind measurement &lt;10m ===
  
Staff of partners will be introduced into operation and maintenance of the equipment, as well as data collection and analysis.&nbsp;
+
Staff of partners will be introduced into operation and maintenance of the equipment, as well as data collection and analysis.&nbsp;  
  
 
*Subsequent to installation and commissioning of the measurement poles, the staff that is responsible for operation, maintenance and data management, will receive introduction according to their work tasks (Training-On-The-Job). <br>
 
*Subsequent to installation and commissioning of the measurement poles, the staff that is responsible for operation, maintenance and data management, will receive introduction according to their work tasks (Training-On-The-Job). <br>
  
Content of the introduction::<br>
+
Content of the introduction::<br>  
  
*Control and, if applicable, error analysis of messearument technology, regular maintenance of the system , documentation of maintenance (log book) <br>
+
*Control and, if applicable, error analysis of messearument technology, regular maintenance of the system , documentation of maintenance (log book) <br>  
 
*Clarification of mode of data transfers of raw data and, likely, data analysis with the local experts <br>
 
*Clarification of mode of data transfers of raw data and, likely, data analysis with the local experts <br>
  
=== Wind measurement &gt; 10m<br> ===
+
=== Wind measurement &gt; 10m<br> ===
  
For wind measurement &gt; 10 m, training content may look as follows:<br>
+
For wind measurement &gt; 10 m, training content may look as follows:<br>  
  
*increase of wind speed because of height over ground and calculation <br>
+
*increase of wind speed because of height over ground and calculation <br>  
*analysis of wind data <br>
+
*analysis of wind data <br>  
*long-term observation and corellation of wind data <br>
+
*long-term observation and corellation of wind data <br>  
*planning wind park layouts, optimization of different types of plants <br>
+
*planning wind park layouts, optimization of different types of plants <br>  
 
*wind energy yield prediction &nbsp;<br>
 
*wind energy yield prediction &nbsp;<br>
  
Line 117: Line 117:
 
*Hybrid systems with wind power<br>
 
*Hybrid systems with wind power<br>
  
Training example: <br>  
+
<br>  
  
 
<br>  
 
<br>  
  
<br>  
+
<references /><br>  
  
<span style="color: rgb(255, 0, 0);">WORK in PROGRESS</span><br>  
+
<span style="color: rgb(255, 0, 0);" /><br>  
  
 
see also: GTZ 2009: Development of Implementation Strategies for a Regional Regulatory Action Plan (RRAP) for the Western Cape. http://www.gtz.de/de/dokumente/gtz2009-en-regional-regulatory-action-plan-western-cape.pdf<br>  
 
see also: GTZ 2009: Development of Implementation Strategies for a Regional Regulatory Action Plan (RRAP) for the Western Cape. http://www.gtz.de/de/dokumente/gtz2009-en-regional-regulatory-action-plan-western-cape.pdf<br>  
Line 141: Line 141:
 
<br>  
 
<br>  
  
 +
<br>
  
 +
<br>
  
 
<br>  
 
<br>  
 
 
  
 
<br>  
 
<br>  
Line 151: Line 151:
 
<br>  
 
<br>  
  
aus ToR - Leistungsbeschreibung&nbsp; Windmessungen und Windpotentialbestimmung (1. Messphase) Anhang A_ToR 1. Messphase<br><br>  
+
<br><br>  
  
 
[[Portal:Wind]]<br>  
 
[[Portal:Wind]]<br>  
 +
 +
<br>
  
 
<br>  
 
<br>  
Line 160: Line 162:
  
 
[[Category:Wind]]
 
[[Category:Wind]]
 
<br>
 

Revision as of 13:42, 26 July 2011

Capacity building measures - overview[1]

for instance:

  • knowledge transfer
  • training for local partner
  • energy policy advisory services
  • vocational training
  • on-the-job e.g. feasibility studies, analysis of wind data 

Class-room and on the job training: Wind data measurements

The first phase of measurment of wind data should be accompanied by training measures for partner/local experts/staff.

Content of the trainings should be (among others):

  • General introduction into wind energy utilization and -technology
  • approach and criteria for site selection
  • methods and instruments for wind data measurement
  • maintenance of measurement equipment and reading of data
  • analysis of wind data

At the end of the training phase, the impacts should be evaluated, e.g. because of an "examination" (test). (cp. also Monitoring)

Wind measurement <10m

Staff of partners will be introduced into operation and maintenance of the equipment, as well as data collection and analysis. 

  • Subsequent to installation and commissioning of the measurement poles, the staff that is responsible for operation, maintenance and data management, will receive introduction according to their work tasks (Training-On-The-Job).

Content of the introduction::

  • Control and, if applicable, error analysis of messearument technology, regular maintenance of the system , documentation of maintenance (log book)
  • Clarification of mode of data transfers of raw data and, likely, data analysis with the local experts

Wind measurement > 10m

For wind measurement > 10 m, training content may look as follows:

  • increase of wind speed because of height over ground and calculation
  • analysis of wind data
  • long-term observation and corellation of wind data
  • planning wind park layouts, optimization of different types of plants
  • wind energy yield prediction  

Training example: Capacity Building Wind Energy[2]

Objective of the training:

  • Introduction in theoretical basics wind energy utilization
  • Introduction wind energy turbine technology
  • Planning wind energy projects
  • Preparation of internation cooperation in the field of wind energy
  • Capacity Building and technology transfer in the field of wind energy

Two Parts:

1. Basic Course "Technology of Wind Power Plants"

2. Advanced Course "Application of Wind Energy"

Basic Course: Introduction into Technology of Wind Power Plants

Content (2-months):

  • Introduction into RE, environmental impacts on energy use
  • Structure of theChinese energy sector
  • RE sectoranalysis
  • Wind energy physiscs(maximal power coefficient; Betzmaximum; wind potential)
  • Wind measurement and evaluation (anemometer calibration; Weibullparameters, power curve of wind turbines; energy output of a turbine)
  • Wind turbine technology
  • Transport an erection of a wind turbine
  • Rotor design
  • Aerodynamic fundamentals
  • Blade dimension based(Betz, Schmitz)
  • Partial load performance
  • Wind tunnel testing
  • Structural loads
  • Scaling
  • Electrical connection
  • Blade construction and production
  • Dynamic behaviour
  • Controlling (different control systems; pich; stall)
  • Economic analysis (methods, external costs, comparisonnalysis, sensitivity analysis, dynamic energy production costs)
  • Side selection
  • Environmental impacts
  • Social acceptance


Advanced Course: Application of Wind Energy

Content (3-months course):

  • Structural loads and operational parameters
  • Design and control concepts of wind turbines
  • Planning wind power projects incl. Electrical connection
  • Technical concepts of German wind turbines
  • Company presentations (AN Bonus, DeWnd, Nordex, REPower, GE Wind, Enercon, Vestas)
  • German wind energy market
  • Policy and incentives in Germany
  • Wind measurement and resource assessment
  • Planning wind parks: Siting optimisation, transmission losses, wakeeffects)
  • Wind power in complex terrain(Micro-siting)
  • Resource assessment (flow models, park calculations)
  • Power curve measurements
  • Technical requirements for dataloggers
  • Environmental impacts of wind power project
  • Planning permission procedures and noise measurements
  • From financing to take over–practical aspectsof project planning
  • Stand alones ystems based on wind and hydropower
  • Wind power integration into the electricity supply system and wind integration aspects in China
  • Generator systems
  • Gridconnections and grid effects
  • Results of the German „250 MW wind power programme“
  • Grid-relevant wind turbine characteristics given by manufacturers
  • Hybrid systems with wind power



  1. parts of content from: GTZ (n.D.): ToR - Leistungsbeschreibung Windmessungen und Windpotentialbestimmung (1. Messphase) Anhang A_ToR 1. Messphase. Eschborn
  2. content from InWent/Knecht, Klaus 2005: Capacity Building als Beitrag zur Wirtschaftskooperation mit China im Bereich Windenergie. TERNA-Fachgespräch, 8. März 2005



see also: GTZ 2009: Development of Implementation Strategies for a Regional Regulatory Action Plan (RRAP) for the Western Cape. http://www.gtz.de/de/dokumente/gtz2009-en-regional-regulatory-action-plan-western-cape.pdf

Training and Capacity Building pp. 112


A Local Manufacturers Experience in Establishing Production Capacities