The study simulates PV business cases for different types of PV installations (residential and commercial roof-top, midsize to large industrial) and provides an overview of the most attractive categories.
 
The study simulates PV business cases for different types of PV installations (residential and commercial roof-top, midsize to large industrial) and provides an overview of the most attractive categories.
  
File:Business case simulation.jpg|546px|alt=Business case simulation.jpg]]
+
[[File:Business case simulation.jpg|546px|alt=Business case simulation.jpg]]
  
 
<br/>
 
<br/>
Line 21: Line 22:
 
<br/>
 
<br/>
  
== <font size="2">Power Purchase Agreements via Tenders or Direct Proposals</font> ==
+
== Power Purchase Agreements via Tenders or Direct Proposals ==
  
<font size="2">Another attractive option to install PV systems in Jordan is to become an independent power producer (IPP) through the installation of renewable energy plants. Power purchase agreements (PPA) are not new to Jordan however; there have been two IPPs producing and selling electricity with combined cycle plants since 2009. By June 2014, no renewable energy plants had been constructed under the first round of the tender scheme and the following two rounds of direct proposals. In the first round, initiated in 2011, PPAs covering 170 MWp of solar PV were initially signed between 12 IPP companies or consortia and the Ministry for Energy and Mining Resources (MEMR). Until April 2014, these were in the process of financial negotiations between investors and the potential IPPs. In the following two rounds of direct proposals, another 400 MWp of solar PV systems had been tendered for direct proposals, including four 50 MW plants and two 100 MW plants.</font>
+
Another attractive option to install PV systems in Jordan is to become an independent power producer (IPP) through the installation of renewable energy plants. Power purchase agreements (PPA) are not new to Jordan however; there have been two IPPs producing and selling electricity with combined cycle plants since 2009. By June 2014, no renewable energy plants had been constructed under the first round of the tender scheme and the following two rounds of direct proposals. In the first round, initiated in 2011, PPAs covering 170 MWp of solar PV were initially signed between 12 IPP companies or consortia and the Ministry for Energy and Mining Resources (MEMR). Until April 2014, these were in the process of financial negotiations between investors and the potential IPPs. In the following two rounds of direct proposals, another 400 MWp of solar PV systems had been tendered for direct proposals, including four 50 MW plants and two 100 MW plants.
  
<font size="2">With the 3rd Round for expression of interest (EOI), one can note that a standard procedure exists for the Direct Proposal Scheme, though none of the rounds have so far resulted in the construction of PV plants.</font>
+
With the 3rd Round for expression of interest (EOI), one can note that a standard procedure exists for the Direct Proposal Scheme, though none of the rounds have so far resulted in the construction of PV plants.
  
<font size="2">[[File:PPA process.jpg|406px|alt=PPA process.jpg]]</font>
+
[[File:PPA process.jpg|406px|alt=PPA process.jpg]]
  
<font size="2">The study provides a financial analysis of a Large PV System of 50 MWp for a PPA contract in Round 2 of the Direct Proposal scheme.</font>
+
The study provides a financial analysis of a Large PV System of 50 MWp for a PPA contract in Round 2 of the Direct Proposal scheme.
  
<font size="2">[[File:PPA cash flow.jpg|529px|alt=PPA cash flow.jpg]]</font>
+
[[File:PPA cash flow.jpg|529px|alt=PPA cash flow.jpg]]
  
 
<br/>
 
<br/>
  
== <font size="2">Dowload the study</font> ==
+
== Dowload the study ==
  
 
<font size="2">[[File:ENABLING PV Jordan web.pdf|thumb|left|180px|Enabling PV in the MENA region - The emerging PV market in Jordan]]</font>
 
<font size="2">[[File:ENABLING PV Jordan web.pdf|thumb|left|180px|Enabling PV in the MENA region - The emerging PV market in Jordan]]</font>

Revision as of 15:55, 16 October 2014


The emerging PV market in Jordan

In Jordan the Renewable Energy and Efficiency Law 13 (REEL) of 2012 as well as bylaws enable Independent Power Producers (IPP) to provide electricity from renewable sources to NEPCO within long-term Power Purchase Agreements (PPA). Private investors may also invest in their own PV system up to 5 MWp to directly consume the electricity produced and offset it against their entire demand within a net-metering scheme. The REEL even allows the generation of electricity at a different site than where the actual consumer is located – so-called energy wheeling. As a result, there are two promising business cases that enable investments in PV: Direct Proposals for PPAs under consecutive rounds of "expressions of interest" and "net-metering". Apart from off-grid installations, around 3 to 4 MWp of solar PV systems under the net-metering scheme had been realized by April 2014, with another 4 to 5 MWp pending within the application process waiting list.

The analysis focuses in more detail on net-metering with PV, its sub-option of energy wheeling, as well as on Power Purchasing Agreements with the MEMR and its state-owned company NEPCO as contract partner. And although tender-based projects exist on government lands, they are not the focus of the study.

Net-Metering and Wheeling

The study describes in detail the legal and administrative processes for net-metering, wheeling as well as the direct proposal scheme. For each process step involved actors and delays are mentioned. In case that barriers have been identified proposals are made to clarify or speed up the process.

Net-Metering Process.jpg

The study simulates PV business cases for different types of PV installations (residential and commercial roof-top, midsize to large industrial) and provides an overview of the most attractive categories.

Business case simulation.jpg



Power Purchase Agreements via Tenders or Direct Proposals

Another attractive option to install PV systems in Jordan is to become an independent power producer (IPP) through the installation of renewable energy plants. Power purchase agreements (PPA) are not new to Jordan however; there have been two IPPs producing and selling electricity with combined cycle plants since 2009. By June 2014, no renewable energy plants had been constructed under the first round of the tender scheme and the following two rounds of direct proposals. In the first round, initiated in 2011, PPAs covering 170 MWp of solar PV were initially signed between 12 IPP companies or consortia and the Ministry for Energy and Mining Resources (MEMR). Until April 2014, these were in the process of financial negotiations between investors and the potential IPPs. In the following two rounds of direct proposals, another 400 MWp of solar PV systems had been tendered for direct proposals, including four 50 MW plants and two 100 MW plants.

With the 3rd Round for expression of interest (EOI), one can note that a standard procedure exists for the Direct Proposal Scheme, though none of the rounds have so far resulted in the construction of PV plants.

PPA process.jpg

The study provides a financial analysis of a Large PV System of 50 MWp for a PPA contract in Round 2 of the Direct Proposal scheme.

PPA cash flow.jpg


Dowload the study

File:ENABLING PV Jordan web.pdf
Enabling PV in the MENA region - The emerging PV market in Jordan



The emerging PV market in Tunisia

XXX


The ENABLING PV approach

Electricity from photovoltaics (PV) is about to reach grid parity in many countries of the MENA region, as well as generation parity in some countries of the region. More and more governments are promoting large or small decentralized forms of PV projects, which are coupled with the conventional electricity grids. Within this context, the overall goal of the project "Enabling PV" is to contribute to the sustainable use of PV in the MENA region. As the first show case, the project focuses on the emerging solar markets of Tunisia and Jordan.

"Enabling PV" as a project is coordinated by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) within the framework of the regional project "Mediterranean Solar Plan (MSP) – Technology Cooperation". It has been financed in the framework of the International Climate Initiative (IKI) of the German Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB). The German Solar Industry Association (BSW-Solar) and the consulting company eclareon GmbH are responsible for executing the "Enabling PV" in Tunisia and Jordan. The project also aims at supporting local renewable energy associations in MENA countries. "ENABLING PV" focuses on the following activities in Tunisia and Jordan: Identifying viable business models for solar PV in Jordan and Tunisia on the basis of real-life experiences of local and foreign project developers and investors.

  • Analyzing the legal and administrative process flows for each identified business model and making the results available to local and international investors.
  • Detecting existing barriers to the implementation of business models.
  • Formulating concrete recommendations for removing these barriers and discussing them with decision-makers.
  • Strengthening cooperation and transferring knowledge between relevant stakeholders, in particular from the private sector in Jordan, Tunisia and Germany.