*[http://cdm.unfccc.int/Projects/DB/DNV-CUK1162559668.67/view Sanquhar and Delta Small Hydro Power Projects] (Sri Lanka): two small-scale, run of river hydropower plants, each with an installed capacity of 1.6 MW. Crediting period 01 Jan 04 - 31 Dec 10. | *[http://cdm.unfccc.int/Projects/DB/DNV-CUK1162559668.67/view Sanquhar and Delta Small Hydro Power Projects] (Sri Lanka): two small-scale, run of river hydropower plants, each with an installed capacity of 1.6 MW. Crediting period 01 Jan 04 - 31 Dec 10. | ||
*[http://cdm.unfccc.int/Projects/DB/SGS-UKL1158857850.19/view Santa Lúcia II Small Hydropower Plant] (Brazil): run-of-river small hydro plant with installed capacity of 7.6 MW. Crediting period 01 Oct 03 - 30 Sep 10. | *[http://cdm.unfccc.int/Projects/DB/SGS-UKL1158857850.19/view Santa Lúcia II Small Hydropower Plant] (Brazil): run-of-river small hydro plant with installed capacity of 7.6 MW. Crediting period 01 Oct 03 - 30 Sep 10. | ||
− | *[http://www.unido.org/fileadmin/media/documents/pdf/Energy_Environment/SmallHydroPower2.pdf Feasibility of CDM as a financing model] (Case studies from Ethiopia) | + | *[http://www.unido.org/fileadmin/media/documents/pdf/Energy_Environment/SmallHydroPower2.pdf Feasibility of CDM as a financing model] (Case studies from Ethiopia) |
+ | *[http://cdm.unfccc.int/ProgrammeOfActivities/poa_db/TFBVP3AU8IGLCO2SX1D059ZYW746RM/view Masca Small Hydro Programme (Honduras): ]PoA small scale, run-of-river hydropower plants, installed capacity between 0.7 - 2.3 MW.Crediting period 01 Sep 2011-31 Aug 2018 (renewable) | ||
=== Selected Studies and Materials === | === Selected Studies and Materials === |
Revision as of 08:29, 15 November 2010
General information on carbon finance (CDM and voluntary carbon markets)
Selected Small Hydro Power Carbon Finance Projects
- CDM PoA Small Hydro Power Generation in Indonesia: GTZ-supported PoA in cooperation with SouthPole.
- Phu Mau hydropower project (Vietnam): small scale run-of-river hydropower plant; three cascades with a total installed capacity of 5.6 MW. Crediting period 05 Jun 09 - 04 Jun 16.
- Sichuan provincial Longchi & Caoyuan Small-scale Hydro Power Bundle Project (China): two small-scale hydro projects - Longchi 5 MW + Caoyuan 4MW. Crediting period 28 Apr 09 - 27 Apr 16.
- Iruttukanam Small Hydro Electric Project (India): small scale run-of-river, 3 MW. Crediting period 01 Jun 09 - 31 May 19.
- e7 Bhutan Micro Hydro Power CDM Project (Bhutan): power generation capacity 70 kW. Crediting period 19 Aug 05 - 18 Aug 12.
- Sanquhar and Delta Small Hydro Power Projects (Sri Lanka): two small-scale, run of river hydropower plants, each with an installed capacity of 1.6 MW. Crediting period 01 Jan 04 - 31 Dec 10.
- Santa Lúcia II Small Hydropower Plant (Brazil): run-of-river small hydro plant with installed capacity of 7.6 MW. Crediting period 01 Oct 03 - 30 Sep 10.
- Feasibility of CDM as a financing model (Case studies from Ethiopia)
- Masca Small Hydro Programme (Honduras): PoA small scale, run-of-river hydropower plants, installed capacity between 0.7 - 2.3 MW.Crediting period 01 Sep 2011-31 Aug 2018 (renewable)
Selected Studies and Materials
- KfW PoA Blueprint Book 2nd Edition - Includes a section on PoA issues for small hydro power
- Experiences from the Small Hydro Power PoA in Indonesia - Presentation by Mirka Bodenbender (26.06.2010)
- A Guide to CDM and Family Hydro Power