Difference between revisions of "Metering and Billing Systems"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 22: | Line 22: | ||
*dis- and re-connection in case of late payment | *dis- and re-connection in case of late payment | ||
− | + | <br> <br> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | <br> | ||
= Pre-paid system with coins or cards = | = Pre-paid system with coins or cards = | ||
Line 111: | Line 92: | ||
[[Category:Hydro]] | [[Category:Hydro]] | ||
[[Category:Solar]] | [[Category:Solar]] | ||
− | [[Category: | + | [[Category:Metering]] |
Revision as of 11:08, 2 June 2010
Standard kWh meter
Advantages
- technique is "state of the art"
- billing is fair and transparent
- reading can be uncoupled from tariff collection
- allows amount and time related tariffs (demand steering)
Disadvantages
- high costs (metering device)
- especially at rural areas in dev. countries the investment cost for a meter unit are way out of range
- dis- and re-connection in case of late payment
Pre-paid system with coins or cards
Advantages
- fair and transparent
- no meter reading
- no overdue costs
- no costs for dis- and re-connection
- close to “ability to pay”-variations
- coins less expensive than cards
Disadvantages
- relatively high cost for metering device
- less forgery proof
- costs for re-collection of coins and selling system for coins/cards
Current limiter
Advantages
- simultaneously protecting against overcurrent (actual purpose)
- delimiting peak demand
- no meter reading required; flat rates according to max. amperage
Disadvantages
- danger of fraud and theft of switch fuses
- additional costs for replacement of cut out fuses
- time of usage not considered; less fair
Flat rate
Advantages
- very cheap (no metering or delimiting device)
- especially in rural areas of Indonesia quite common and accepted
- can be combined with number of appliances or installed wattage (social control)
Disadvantages
- provokes waste of electricity, no incentive for saving
- no load control / demand steering possible (peaks)
- less fair
Experience form Nepal : Innovative Metering
⇒ Back to Solar Section ⇒ Back to Hydro Section