Difference between revisions of "Fierza"
From energypedia
***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Albania |HPDBCity/Town=Bajram Curri, Shkoder, |HPDBCoordinates=Latitude= 42.25139, Longitude= 20.04306 |HPDBDate of Commission=1978 |HPDBStream Name=Drin Riv...") |
***** (***** | *****) m |
||
(One intermediate revision by one other user not shown) | |||
Line 2: | Line 2: | ||
|HPDBCountry=Albania | |HPDBCountry=Albania | ||
|HPDBCity/Town=Bajram Curri, Shkoder, | |HPDBCity/Town=Bajram Curri, Shkoder, | ||
− | |HPDBCoordinates | + | |HPDBCoordinates=42.25139, 20.04306 |
− | |HPDBDate of Commission=1978 | + | |HPDBDate of Commission=1978 |
|HPDBStream Name=Drin River | |HPDBStream Name=Drin River | ||
|HPDBOperator=Korporata Elektroenergjitike Shqiptare (KESH). | |HPDBOperator=Korporata Elektroenergjitike Shqiptare (KESH). | ||
+ | |HPDBProject Status=Completed | ||
|HPDBPower=500000 | |HPDBPower=500000 | ||
|HPDBTurbine Type=Fracis turbines | |HPDBTurbine Type=Fracis turbines | ||
Line 13: | Line 14: | ||
|HPDBCommentGI=Connected to national grid via 220kV lines | |HPDBCommentGI=Connected to national grid via 220kV lines | ||
|HPDBDam Type=Dam on river with reservoir | |HPDBDam Type=Dam on river with reservoir | ||
− | |HPDBDam Construction Material=Rock-fill Dam | + | |HPDBDam Construction Material=Rock-fill Dam |
|HPDBDam Height=170 | |HPDBDam Height=170 | ||
}} | }} |
Latest revision as of 08:05, 3 September 2012
Back to the Hydropower Sites Database
General Information
Country: | Albania |
---|---|
City/Town: | Bajram Curri, Shkoder, |
Coordinates (Powerhouse): | 42° 15' 5.00" N, 20° 2' 35.02" E |
Year of Commission: | 1978 |
Basin Name: | |
Stream Name: | Drin River |
Developer: | |
Operator: | Korporata Elektroenergjitike Shqiptare (KESH). |
Project Status: | Completed |
Any other uses of the water source: | |
Contact: | |
Comment: | |
Link to Photos: |
Technical Information
Power: (kW) | 500000 |
---|---|
Energy (kWh/a): | |
Capacity Factor (%): | |
Penstock Diameter (mm): | |
Penstock Length (m): | |
Penstock Material (m³/s): | |
Maximum Flow of the Penstock (m³/s): | |
Minimum Flow of the Stream (m³/s): | |
Head (m): | |
Turbine Type: | Fracis turbines |
Turbine Manufacturer: | Sulzer |
Generator Type: | |
Generator Capacity (kW): | |
Generator Manufacturer: | Dongfang |
Comment: |
Mini/Island Grid Information
Mini Grid: | No |
---|---|
Load Control Information: | |
Connection Type: | |
Public Lighting: | |
Length of Transmission Line (m): | |
Voltage (v): | |
Transmission Conductor (type) : | |
Diameter of Conductor (mm²): | |
Transformer Rating (kVA): | |
Link to Grid: | |
S.W.E.R: | |
Operational Period (Xdays/year): | |
Comment: | Connected to national grid via 220kV lines |
Dam Information
Dam Type: |
Dam on river with reservoir |
---|---|
Dam Construction Material: | Rock-fill Dam |
Dam Height [m]: | 170 |
Length of Dam [m]: | |
Storage Volume of Reservoir (m³): | |
Flood Storage of Reservoir: | |
Channel Material: | |
Comment: |
Economic Information
Cost (€): | |
---|---|
Donor/Financier & Percentage: | |
Tariff Levels: | |
Connected Households: | |
Connection Cost (€): | |
Cost to be Covered by Households (%): | |
Comment: | |
Link to Cost Breakdown: |