Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all.
Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.
Thank you for your support, your donation, big or small, truly matters!
Difference between revisions of "Turbines in Private Sector Participation (PSP) Hydro Rwanda"
***** (***** | *****) m |
***** (***** | *****) m (Wiki Gardener moved page Turbines in PSP Hydro Rwanda to Turbines in Private Sector Participation (PSP) Hydro Rwanda without leaving a redirect) |
||
| (6 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
| − | |||
| − | <br> | + | = Overview<br/> = |
| − | <br> | + | [http://endev.info/content/Rwanda Private Sector Participation (PSP) in Micro-Hydro Power Supply for Rural Development, Rwanda (PSP Hydro)]<br/> |
| − | {| | + | Concretely, PSP Hydro envisages supporting five private Rwandan Project Developers financially and with ongoing training. The intervention is realized under the umbrella of the Dutch-German Energy Partnership [[Energising_Development_(EnDev)|Energising Development (EnDev).]]<br/> |
| + | |||
| + | <br/> | ||
| + | |||
| + | <br/> | ||
| + | |||
| + | = Hydro Sites in Rwanda<br/> = | ||
| + | |||
| + | Three hydro sites are currently under development in the EnDev project PSP Hydro in Rwanda. | ||
| + | |||
| + | <u>Here is some date about the turbines and generators that will be installed in the projects:</u> | ||
| + | |||
| + | {| cellspacing="0" cellpadding="0" border="1" style="width: 100%" | ||
|- | |- | ||
| − | | | + | | style="width: 15%; height: 37px" rowspan="2" | '''Project site'''<br/> |
| − | | | + | | style="width: 20px" rowspan="2" | '''project developer'''<br/> |
| − | | | + | | style="width: 80px" | '''capazity''' |
| − | | | + | | style="width: 80px" | '''Turbine Manufacturer''' |
|- | |- | ||
| − | | | + | | style="height: 17px" | '''[kW]''' |
| − | | | + | | |
|- | |- | ||
| − | | | + | | style="width: 154px; height: 51px" | Murunda |
| − | | | + | | style="width: 128px" | REPRO |
| − | | | + | | style="width: 80px" | 96 |
| − | | | + | | style="width: 80px" | generator: Ossberger (new) |
| − | turbine: Ossberger (old) | + | turbine: Ossberger (old) |
|- | |- | ||
| − | | | + | | style="width: 154px; height: 17px" | Masimeru and Maruruma |
| − | | | + | | style="width: 128px" | ENNy |
| − | | | + | | style="width: 80px" | 250<br/> |
| − | | | + | | style="width: 80px" | |
| − | generator + turbine Kochendörfer (new) | + | generator + turbine Kochendörfer (new) |
|- | |- | ||
| − | | | + | | style="width: 154px; height: 51px" | Musarara |
| − | | | + | | style="width: 128px" | SOGEMR |
| − | | | + | | style="width: 80px" | 438<br/> |
| − | | | + | | style="width: 80px" | |
| − | generator + turbine Ossberger (new) | + | generator + turbine Ossberger (new) |
|} | |} | ||
| − | <br | + | <br/> |
| + | = Further Information<br/> = | ||
| + | |||
| + | *[[:File:Psp hydro rwanda baseline report - rwi2009.pdf|Psp hydro rwanda baseline report]]<br/> | ||
| + | |||
| + | <br/> | ||
| + | |||
| + | = References = | ||
| + | |||
| + | <references /> | ||
| + | |||
| + | [[Category:Rwanda]] | ||
[[Category:Hydro]] | [[Category:Hydro]] | ||
| − | |||
Latest revision as of 16:09, 7 August 2014
Overview
Concretely, PSP Hydro envisages supporting five private Rwandan Project Developers financially and with ongoing training. The intervention is realized under the umbrella of the Dutch-German Energy Partnership Energising Development (EnDev).
Hydro Sites in Rwanda
Three hydro sites are currently under development in the EnDev project PSP Hydro in Rwanda.
Here is some date about the turbines and generators that will be installed in the projects:
| Project site |
project developer |
capazity | Turbine Manufacturer |
| [kW] | |||
| Murunda | REPRO | 96 | generator: Ossberger (new)
turbine: Ossberger (old) |
| Masimeru and Maruruma | ENNy | 250 |
generator + turbine Kochendörfer (new) |
| Musarara | SOGEMR | 438 |
generator + turbine Ossberger (new) |
Further Information



















