Difference between revisions of "Costs and Tariff Setting - Examples"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m (Wiki Gardener moved page Costs and Tariff Setting to Costs and Tariff Setting - Examples without leaving a redirect)
 
(15 intermediate revisions by 6 users not shown)
Line 1: Line 1:
= Example: EnDev Senegal  =
 
  
== Costs  ==
+
= Overview =
  
Hybrid mini-grids would be cost-efficient without subsidies if the poorest segment of the population could pay 4,700 to 5,000 FCFA (7-8 EUR).  
+
Please [http://help.energypedia.info/wiki/Edit add further interesting examples] and [http://help.energypedia.info/wiki/Link_Articles set internal or external links]
  
If the payment capacity is lower than that of the ‘optimal’ village, the supply should be limited to two or three, instead of four service levels, which better correspond to the group needs of the middle income segment. Fulfilling energy needs of the richest segment results in a considerable reduction of the profitability index.
 
  
If no investors are motivated to participate in the projects after these last considerations, then management lead by communal associations, which focus more on the benefits electrification, will reduce the amount of profit required and consequently the subsidies needed.
 
  
EnDev provides a subsidy of 70% of the initial investment costs. The operator and the rural commune contribute 20% to the initial investment, whereby the operator usually contributes 15% by providing services and logistics. The remaining 5% is covered by the commune mainly through treasury bills and the provision of manpower for the construction sites. The end-users pay 10% consisting of a connection fee and the reimbursment of pre-financed indoor installations.
+
► [[Tariffs|Tariffs in General (Flat Rate Tariffs, Best Practice and Tariff Setting)]]
  
<br>
 
  
== Tariff Setting  ==
 
  
The project suggested the tariffs to be aproved by the Regulatory Commision for the Electricity Sector. The calculation is equally based on socio-economic studies conducted in the intervention region as well as on the operator's business plan.
+
= Example: Hybrid Mini-Grid Project in Senegal by EnDev =
  
The end-users pay a connection fee in the beginning and a monthly fee for the electricity provided. A part of the costs for the indoor installations is pre-financed by the operator and has to be reimbursed by the end-user through a addition to the monthly payment within the first two or three years depending on the service level considered.
+
*[[Energising Development (EnDev)|Energising Development (EnDev)]]
 +
*[[Senegal Energy Situation|Senegal Energy Situation]]
  
Four service levels according to end-users energy demand are defined by the Regulatory Commision for the Electricity Sector. Each service level corresponds to a certain power made available to the end-user.
+
<br/>
  
{| style="width: 359px; height: 93px" cellspacing="1" cellpadding="1" width="359" border="1"
+
== Costs ==
 +
 
 +
Hybrid mini-grids would be cost-efficient without [[Subsidies|subsidies]] if the poorest segment of the population could pay 4,700 to 5,000 FCFA (7-8 EUR).
 +
 
 +
If the payment capacity is lower than that of the ‘optimal’ village, the supply should be limited to two or three, instead of four service levels, which better correspond to the group needs of the middle income segment. Fulfilling energy needs of the richest segment results in a considerable reduction of the profitability index.
 +
 
 +
If no investors are motivated to participate in the projects after these last considerations, then management lead by communal associations, which focus more on the benefits electrification, will reduce the amount of profit required and consequently the subsidies needed.
 +
 
 +
EnDev provides a subsidy of 70% of the initial investment costs. The operator and the rural municipality contribute 20% to the initial investment, whereby the operator usually contributes 15% by providing services and logistics. The remaining 5% is covered by the municipality mainly through treasury bills and the provision of manpower for the construction sites. The end-users pay 10% consisting of a connection fee and the reimbursment of pre-financed indoor installations.
 +
 
 +
<br/>
 +
 
 +
== Tariff Setting ==
 +
 
 +
The project suggested the tariffs to be aproved by the Regulatory Commision for the Electricity Sector. The calculation is equally based on socio-economic studies conducted in the intervention region as well as on the operator's business plan.
 +
 
 +
The end-users pay a connection fee in the beginning and a monthly fee for the electricity provided. A part of the costs for the indoor installations is pre-financed by the operator and has to be reimbursed by the end-user through an addition to the monthly payment within the first two or three years depending on the service level considered.
 +
 
 +
Four service levels according to end-users energy demand are defined by the Regulatory Commision for the Electricity Sector. Each service level corresponds to a certain power made available to the end-user.
 +
 
 +
{| cellspacing="1" cellpadding="1" border="1" style="height: 104px;  width: 100px;  width: 100%"
 
|-
 
|-
| Service Level  
+
|  
| Level 1  
+
'''Service Level'''
| Level 2  
+
 
| Level 3  
+
|  
| Level 4
+
'''Level 1'''
 +
 
 +
|  
 +
'''Level''' '''2'''
 +
 
 +
|  
 +
'''Level 3'''
 +
 
 +
|  
 +
'''Level 4'''
 +
 
 
|-
 
|-
| Power made available  
+
|  
| 50 W  
+
'''Power made available'''
| 65 W  
+
 
| 180 W  
+
|  
| &gt; 180 W
+
50 W
 +
 
 +
|  
 +
65 W
 +
 
 +
|  
 +
180 W
 +
 
 +
|  
 +
> 180 W
 +
 
 
|}
 
|}
  
For the levels 1 to 3 a limiter guarantees that the end-user can't exeed the contracted limit, whereas for level 4 a counter is installed.  
+
For the levels 1 to 3 a limiter guarantees that the end-user can't exeed the contracted limit, whereas for level 4 a counter is installed.
 +
 
 +
<br/>
  
The following table shows for each service level which appliances can be powered . For level 4 the average consumtion of an average rural household is considered. As the consumption within service level 4 is not limited in terms of quantity productive use could be considered as well.  
+
The following table shows for each service level which appliances can be powered. For level 4 the average consumtion of an average rural household is considered. As the consumption within service level 4 is not limited in terms of quantity productive use could be considered as well.
  
{| style="width: 714px; height: 192px" cellspacing="1" cellpadding="1" width="714" border="1"
+
{| cellspacing="1" cellpadding="1" border="1" style="width: 100%"
 
|-
 
|-
| .
+
| rowspan="2" |
| colspan="2" | '''Level 1'''  
+
<br/>
| colspan="2" | '''Level 2'''  
+
 
| colspan="2" | '''Level 3'''  
+
| colspan="2" |  
| colspan="2" | '''Level 4'''
+
'''Level 1'''
 +
 
 +
| colspan="2" |  
 +
'''Level 2'''
 +
 
 +
| colspan="2" |  
 +
'''Level 3'''
 +
 
 +
| colspan="2" |  
 +
'''Level 4'''
 +
 
 
|-
 
|-
 
|  
 
|  
| No.  
+
No.
| Time of use (hours/day)  
+
 
| No.  
+
|  
| Time of use (hours/day)  
+
Time of use (hours/day)
| No.  
+
 
| Time of use (hours/day)  
+
|  
| No.  
+
No.
| Time of use (hours/day)
+
 
 +
|  
 +
Time of use (hours/day)
 +
 
 +
|  
 +
No.
 +
 
 +
|  
 +
Time of use (hours/day)
 +
 
 +
|  
 +
No.
 +
 
 +
|  
 +
Time of use (hours/day)
 +
 
 
|-
 
|-
| Lamp 8 W  
+
|  
| 4  
+
'''Lamp 8 W'''
| 2,5  
+
 
| 7  
+
|  
| 18  
+
4
| 11  
+
 
| 29  
+
|  
| 14  
+
2,5
| 34
+
 
 +
|  
 +
7
 +
 
 +
|  
 +
18
 +
 
 +
|  
 +
11
 +
 
 +
|  
 +
29
 +
 
 +
|  
 +
14
 +
 
 +
|  
 +
34
 +
 
 
|-
 
|-
| B&amp;W TV  
+
|  
| 1  
+
'''B&W TV'''
| 3  
+
 
| 1  
+
|  
| 4  
+
1
| .
+
 
| .
+
|  
| .
+
3
| .
+
 
 +
|  
 +
1
 +
 
 +
|  
 +
4
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 
|-
 
|-
| Colour TV  
+
|  
| .
+
'''Colour TV'''
| .
+
 
| .
+
|  
| .
+
.
| 1  
+
 
| 5  
+
|  
| 1  
+
.
| 5
+
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
1
 +
 
 +
|  
 +
5
 +
 
 +
|  
 +
1
 +
 
 +
|  
 +
5
 +
 
 
|-
 
|-
| Video  
+
|  
| .
+
'''Video'''
| .
+
 
| .
+
|  
| .
+
.
| .
+
 
| .
+
|  
| 1  
+
.
| 1.3
+
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
1
 +
 
 +
|  
 +
1.3
 +
 
 
|-
 
|-
| Radio  
+
|  
| 1  
+
'''Radio'''
| 2  
+
 
| .
+
|  
| .
+
1
| .
+
 
| .
+
|  
| .
+
2
| .
+
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 
|-
 
|-
| Cassette Radio  
+
|  
| .
+
'''Cassette Radio'''
| .
+
 
| 1  
+
|  
| 4  
+
.
| 1  
+
 
| 5  
+
|  
| 1  
+
.
| 5
+
 
 +
|  
 +
1
 +
 
 +
|  
 +
4
 +
 
 +
|  
 +
1
 +
 
 +
|  
 +
5
 +
 
 +
|  
 +
1
 +
 
 +
|  
 +
5
 +
 
 
|-
 
|-
| Fan  
+
|  
| .
+
'''Fan'''
| .
+
 
| .
+
|  
| .
+
.
| 1  
+
 
| 2  
+
|  
| 1  
+
.
| 3
+
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
1
 +
 
 +
|  
 +
2
 +
 
 +
|  
 +
1
 +
 
 +
|  
 +
3
 +
 
 
|-
 
|-
| Fridge  
+
|  
| .
+
'''Fridge'''
| .
+
 
| .
+
|  
| .
+
.
| .
+
 
| .
+
|  
| 1  
+
.
| 10
+
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
.
 +
 
 +
|  
 +
1
 +
 
 +
|  
 +
10
 +
 
 
|-
 
|-
| '''Consumption (kWh/day)'''  
+
|  
| colspan="2" | 0.146  
+
'''Consumption (kWh/day)'''
| colspan="2" | 0.304  
+
 
| colspan="2" | 0.677  
+
| colspan="2" |  
| colspan="2" | 1.716
+
0.146
 +
 
 +
| colspan="2" |  
 +
0.304
 +
 
 +
| colspan="2" |  
 +
0.677
 +
 
 +
| colspan="2" |  
 +
1.716
 +
 
 
|}
 
|}
  
<br>
+
<br/>
  
'''Tariffs are set as follows:'''
+
<u>'''Tariffs are set as follows:'''</u>
  
{| style="width: 888px; height: 332px" cellspacing="1" cellpadding="1" width="888" border="1"
+
{| cellspacing="1" cellpadding="1" border="1" style="width: 100%"
 
|-
 
|-
| PV-diesel hybrid mini-grid  
+
| style="width: 267px" |
| Level 1 (FCFA)  
+
'''PV-diesel hybrid mini-grid'''
| Level 2 (FCFA)  
+
 
| Level 3 (FCFA)  
+
| style="width: 86px" |
| Level 4 (FCFA)
+
'''Level 1 (FCFA)'''
 +
 
 +
|  
 +
'''Level 2 (FCFA)'''
 +
 
 +
|  
 +
'''Level 3 (FCFA)'''
 +
 
 +
|  
 +
'''Level 4 (FCFA)'''
 +
 
 
|-
 
|-
| Connection Fee  
+
| style="width: 267px" |
| 20,000  
+
'''Connection Fee'''
| 37,500  
+
 
| 65,000  
+
| style="width: 86px" |
| 100,000
+
20,000
 +
 
 +
|  
 +
37,500
 +
 
 +
|  
 +
65,000
 +
 
 +
|  
 +
100,000
 +
 
 
|-
 
|-
| Monthly Payment during the first Years  
+
| style="width: 267px" |
| 6,100  
+
'''Monthly Payment during the first Years'''
| 10,000  
+
 
| 16,500  
+
| style="width: 86px" |
| fix part: 16,000<br>variable part: 139 FCFA/kWh
+
6,100
 +
 
 +
|  
 +
10,000
 +
 
 +
|  
 +
16,500
 +
 
 +
|  
 +
fix part: 16,000<br/>variable part: 139 FCFA/kWh
 +
 
 
|-
 
|-
| Payment Period for the Indoor Installations  
+
| style="width: 267px" |
| 2 years  
+
'''Payment Period for the Indoor Installations'''
| 2 years  
+
 
| 3 years  
+
| style="width: 86px" |
| 3 years
+
2 years
 +
 
 +
|  
 +
2 years
 +
 
 +
|  
 +
3 years
 +
 
 +
|  
 +
3 years
 +
 
 
|-
 
|-
| Monthly Payment after Payment for the Indoor Installations  
+
| style="width: 267px" |
| 4,000  
+
'''Monthly Payment after Payment for the Indoor Installations'''
| 7,500  
+
 
| 13,000  
+
| style="width: 86px" |
| fix part: 11,300<br>variable part: 139 FCFA/kWh
+
4,000
 +
 
 +
|  
 +
7,500
 +
 
 +
|  
 +
13,000
 +
 
 +
|  
 +
fix part: 11,300<br/>variable part: 139 FCFA/kWh
 +
 
 
|}
 
|}
  
<br>
+
<br/>
 +
 
 +
In the first three service levels the monthly payment rate is fixed. Only for the fourth level electricity consumption is metered and a part of the fee hast to be payed according to consumption.
 +
 
 +
<br/>
 +
 
 +
= Example: PV Hybrid vs. Diesel in Micro-Grid for Village Power, Bolivian Amazon<br/> =
 +
 
 +
*[[Bolivia Energy Situation|Bolivia Energy Situation]]
 +
*[http://siteresources.worldbank.org/EXTRENENERGYTK/Resources/5138246-1237906527727/5950705-1239304688925/Electricity0Co1J10Mendoza10C10Torra.pdf ELECTRICITY COSTS OF PV- HYBRID vs. DIESEL IN MICROGRIDS FOR VILLAGE POWER] (Authors: X. Vallvé,G. Gafas, C. Arias J.J. Mendoza, C. Torra)
 +
 
 +
<br/>
 +
 
 +
= Further Information =
  
In the first three serivce levels the monthly payment rate is fixed. Only for the fourth level electricity consumption is metered and a part of the fee hast to be payed according to consumption.
+
*[[Tariffs|Tariffs]]
  
<br>
+
<br/>
  
<br>
+
= References =
  
[[Solar Main Page|⇒ Back to Solar Section]]
+
<references />
  
[[Category:Solar]]
+
[[Category:Hybrid_Systems]]
 +
[[Category:Senegal]]
 +
[[Category:Bolivia]]

Latest revision as of 14:01, 6 November 2014

Overview

Please add further interesting examples and set internal or external links


Tariffs in General (Flat Rate Tariffs, Best Practice and Tariff Setting)


Example: Hybrid Mini-Grid Project in Senegal by EnDev


Costs

Hybrid mini-grids would be cost-efficient without subsidies if the poorest segment of the population could pay 4,700 to 5,000 FCFA (7-8 EUR).

If the payment capacity is lower than that of the ‘optimal’ village, the supply should be limited to two or three, instead of four service levels, which better correspond to the group needs of the middle income segment. Fulfilling energy needs of the richest segment results in a considerable reduction of the profitability index.

If no investors are motivated to participate in the projects after these last considerations, then management lead by communal associations, which focus more on the benefits electrification, will reduce the amount of profit required and consequently the subsidies needed.

EnDev provides a subsidy of 70% of the initial investment costs. The operator and the rural municipality contribute 20% to the initial investment, whereby the operator usually contributes 15% by providing services and logistics. The remaining 5% is covered by the municipality mainly through treasury bills and the provision of manpower for the construction sites. The end-users pay 10% consisting of a connection fee and the reimbursment of pre-financed indoor installations.


Tariff Setting

The project suggested the tariffs to be aproved by the Regulatory Commision for the Electricity Sector. The calculation is equally based on socio-economic studies conducted in the intervention region as well as on the operator's business plan.

The end-users pay a connection fee in the beginning and a monthly fee for the electricity provided. A part of the costs for the indoor installations is pre-financed by the operator and has to be reimbursed by the end-user through an addition to the monthly payment within the first two or three years depending on the service level considered.

Four service levels according to end-users energy demand are defined by the Regulatory Commision for the Electricity Sector. Each service level corresponds to a certain power made available to the end-user.

Service Level

Level 1

Level 2

Level 3

Level 4

Power made available

50 W

65 W

180 W

> 180 W

For the levels 1 to 3 a limiter guarantees that the end-user can't exeed the contracted limit, whereas for level 4 a counter is installed.


The following table shows for each service level which appliances can be powered. For level 4 the average consumtion of an average rural household is considered. As the consumption within service level 4 is not limited in terms of quantity productive use could be considered as well.


Level 1

Level 2

Level 3

Level 4

No.

Time of use (hours/day)

No.

Time of use (hours/day)

No.

Time of use (hours/day)

No.

Time of use (hours/day)

Lamp 8 W

4

2,5

7

18

11

29

14

34

B&W TV

1

3

1

4

.

.

.

.

Colour TV

.

.

.

.

1

5

1

5

Video

.

.

.

.

.

.

1

1.3

Radio

1

2

.

.

.

.

.

.

Cassette Radio

.

.

1

4

1

5

1

5

Fan

.

.

.

.

1

2

1

3

Fridge

.

.

.

.

.

.

1

10

Consumption (kWh/day)

0.146

0.304

0.677

1.716


Tariffs are set as follows:

PV-diesel hybrid mini-grid

Level 1 (FCFA)

Level 2 (FCFA)

Level 3 (FCFA)

Level 4 (FCFA)

Connection Fee

20,000

37,500

65,000

100,000

Monthly Payment during the first Years

6,100

10,000

16,500

fix part: 16,000
variable part: 139 FCFA/kWh

Payment Period for the Indoor Installations

2 years

2 years

3 years

3 years

Monthly Payment after Payment for the Indoor Installations

4,000

7,500

13,000

fix part: 11,300
variable part: 139 FCFA/kWh


In the first three service levels the monthly payment rate is fixed. Only for the fourth level electricity consumption is metered and a part of the fee hast to be payed according to consumption.


Example: PV Hybrid vs. Diesel in Micro-Grid for Village Power, Bolivian Amazon


Further Information


References