Knowledge fuels change
For over a decade, Energypedia has shared free, reliable energy expertise with the world.
We’re now facing a serious funding gap.
Help keep this platform alive — your donation, big or small, truly matters!
Thank you for your support
Difference between revisions of "MHP El Plan"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
| Line 210: | Line 210: | ||
|- | |- | ||
| style="width: 194px;" | <span style="line-height: 18px;">Mini Grid:</span> | | style="width: 194px;" | <span style="line-height: 18px;">Mini Grid:</span> | ||
| − | | style="width: 390px;" | <span style="line-height: 18px;"></span> | + | | style="width: 390px;" | yes<span style="line-height: 18px;"></span> |
|- | |- | ||
| style="width: 194px;" | <span style="line-height: 18px;">Connection to national Grid:</span> | | style="width: 194px;" | <span style="line-height: 18px;">Connection to national Grid:</span> | ||
| Line 225: | Line 225: | ||
|} | |} | ||
| − | |||
| − | |||
| − | |||
= Economic Information<br/> = | = Economic Information<br/> = | ||
| Line 261: | Line 258: | ||
|} | |} | ||
| − | |||
= Project Photos<br/> = | = Project Photos<br/> = | ||
| + | |||
| + | {| border="1" align="left" cellspacing="1" cellpadding="2" style="width: 600px;" | ||
| + | |- | ||
| + | | style="width: 50%;" | [[File:ElPlan.JPG|thumb|Add caption here]] | ||
| + | | style="width: 50%;" | | ||
| + | |- | ||
| + | | style="width: 50%;" | | ||
| + | | style="width: 50%;" | | ||
| + | |} | ||
Revision as of 20:53, 27 March 2014
Overview
| Name of the site: | El Plan |
| Country: | Nicaragua (GPS Coordinates: ?) |
| Turbine Type: | Pelton |
| Power Output: | 24 kW |
| Project Status: | in operation |
| Comments: | - |
Operation Data
| Gross Head: | 200m |
| Net/Design Head: | 200m |
| Flow (design flow): | 20 l/s |
| Comments on flow variation during the year: | Problems with flow during dry season. |
Technical Information
| Comments: | General Technical Comments on the Project |
Civil Works and Penstock
| Dam construction material: | Concrete |
| Dam Dimensions: | |
| Storage Volume Reservoir: | |
| Sedimentation Basin material: | Concrete |
| Sedimentation Basin Dimensions: | |
| Penstock Length: | |
| Penstock Diameter at Beginning: | |
| Penstock Diameter at End: | |
| Penstock Changes of Diameter: | |
| Penstock Material: | PVC |
| Security Valve: |
Electromechanical Equipment
Turbine
| Turbine Type: | Pelton, 1 injector |
| Turbine Diameter: | |
| Turbine Material: | |
| Turbine Manufacturer: | Nica Bosch (Contact: company does not exist any more) |
| Potencial (nominal): | 24 kW |
| Rated Head: | |
| Rated Flow: | |
| Rated Speed: | |
| Runaway Speed: | |
| Shaft diameter and material: | |
| Direction of Rotation: | clockwise |
| Orientation of Shaft: | horizontal |
Generator:
| Generator Manufacturer and Model: | Stamford |
| Phases: | 3 |
| Potencial (nominal): | |
| Nominal voltage: | |
| Nominal Speed: | |
| Frequency: | 60 Hz |
| Isolation Class: |
Mechanical Transmission / Coupling
| Type of Belt: | |
| Belt Manufacturer: | |
| Distance between Pulleys: | |
| Diameter of Generator Pulley: | |
| Diameter of Generator Pulley: |
Control System
| Control System Manufacturer and Model: | Thomson and Howe Energy Systems, J2 |
| Type of Control: | Load Control |
| Capacity: |
Electrical Transmission
| Mini Grid: | yes |
| Connection to national Grid: | no |
| Grid Voltage: | |
| Diameter of Conductor: | |
| Transformer Rating: |
Economic Information
| Developer: (Contact: ) | |
| Start of Construction: | |
| Date of Commissioning: | |
| Ownership / Operation Model: | |
| Operator: | |
| Tariff structure: | |
| Connected Housholds: | 25 |
| Connection Cost Cost to be covered by houshold: | |
| Overall Project Costs: |



















