Difference between revisions of "File:Establishment of Local PV System Battery Testing Procedure.doc"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
Line 1: Line 1:
  
The overall objective of this TOR is strengthening the capability of PV systems battery certification and testing. The consultant provides recommendations for comparative performance tests, tests under conditions similar to that experienced in reality, revisions, inspections, etc.
+
The overall objective of this TOR is strengthening the capability of PV systems battery certification and testing. The consultant will provide recommendations for a technical standard and test procedures for certifying batteries to be used in PV sytems, inspect and address the current battery testing capabilities in the country, and prepare TOR for strengthening the capability of the testing center.
 +
 
  
<br/>
 
  
 
== Licensing ==
 
== Licensing ==
Line 10: Line 10:
 
<br/>
 
<br/>
  
 +
[[Category:Photovoltaic|{{PAGENAME}}]]
 +
[[Category:PV|{{PAGENAME}}]]
 +
[[Category:PRC_Terms_of_Reference|{{PAGENAME}}]]
 +
[[Category:Off-grid|{{PAGENAME}}]]
 +
[[Category:Battery_Charging_Systems|{{PAGENAME}}]]
 
[[Category:Batteries|{{PAGENAME}}]]
 
[[Category:Batteries|{{PAGENAME}}]]
[[Category:Battery_Charging_Systems|{{PAGENAME}}]]
 
[[Category:Off-grid|{{PAGENAME}}]]
 
[[Category:PRC_Terms_of_Reference|{{PAGENAME}}]]
 
[[Category:PV|{{PAGENAME}}]]
 
[[Category:Photovoltaic|{{PAGENAME}}]]
 

Revision as of 15:44, 2 December 2013

The overall objective of this TOR is strengthening the capability of PV systems battery certification and testing. The consultant will provide recommendations for a technical standard and test procedures for certifying batteries to be used in PV sytems, inspect and address the current battery testing capabilities in the country, and prepare TOR for strengthening the capability of the testing center.


Licensing

Template:License otherswork World Bank


File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current23:38, 27 September 2013 (51 KB)***** (***** | *****)The overall objective of this TOR is strengthening the capability of PV systems battery certification and testing. The consultant provides recommendations for comparative performance tests, tests under conditions similar to that experienced in reality,...

There are no pages that use this file.