Difference between revisions of "Musi"
From energypedia
***** (***** | *****) (Created page with "{{HPDB |HPDBCountry=Indonesia |HPDBCity/Town=Bengkulu |HPDBCoordinates=Latitude= -3.766, Longitude= 102.435 |HPDBDate of Commission=2006 |HPDBStream Name=Musi and Simpang Aur ri...") |
***** (***** | *****) m |
||
Line 2: | Line 2: | ||
|HPDBCountry=Indonesia | |HPDBCountry=Indonesia | ||
|HPDBCity/Town=Bengkulu | |HPDBCity/Town=Bengkulu | ||
− | |HPDBCoordinates | + | |HPDBCoordinates=-3.766, 102.435 |
− | |HPDBDate of Commission=2006 | + | |HPDBDate of Commission=2006 |
|HPDBStream Name=Musi and Simpang Aur rivers | |HPDBStream Name=Musi and Simpang Aur rivers | ||
|HPDBOperator=PT PLN (Persero) | |HPDBOperator=PT PLN (Persero) | ||
Line 13: | Line 13: | ||
|HPDBCommentGI=Connected to Curup and onto Bukit Asan SubStation | |HPDBCommentGI=Connected to Curup and onto Bukit Asan SubStation | ||
|HPDBDam Type=Dam with Run of river | |HPDBDam Type=Dam with Run of river | ||
− | |HPDBDam Construction Material=Concrete Gravity Dam | + | |HPDBDam Construction Material=Concrete Gravity Dam |
|HPDBDam Height=16 | |HPDBDam Height=16 | ||
}} | }} |
Latest revision as of 08:10, 3 September 2012
Back to the Hydropower Sites Database
General Information
Country: | Indonesia |
---|---|
City/Town: | Bengkulu |
Coordinates (Powerhouse): | 3° 45' 57.60" S, 102° 26' 6.00" E |
Year of Commission: | 2006 |
Basin Name: | |
Stream Name: | Musi and Simpang Aur rivers |
Developer: | |
Operator: | PT PLN (Persero) |
Project Status: | Completed |
Any other uses of the water source: | |
Contact: | |
Comment: | |
Link to Photos: |
Technical Information
Power: (kW) | 210,000 |
---|---|
Energy (kWh/a): | |
Capacity Factor (%): | |
Penstock Diameter (mm): | |
Penstock Length (m): | |
Penstock Material (m³/s): | |
Maximum Flow of the Penstock (m³/s): | |
Minimum Flow of the Stream (m³/s): | |
Head (m): | |
Turbine Type: | |
Turbine Manufacturer: | VA TECH HYDRO |
Generator Type: | |
Generator Capacity (kW): | |
Generator Manufacturer: | VA TECH HYDRO |
Comment: |
Mini/Island Grid Information
Mini Grid: | No |
---|---|
Load Control Information: | |
Connection Type: | |
Public Lighting: | |
Length of Transmission Line (m): | |
Voltage (v): | |
Transmission Conductor (type) : | |
Diameter of Conductor (mm²): | |
Transformer Rating (kVA): | |
Link to Grid: | |
S.W.E.R: | |
Operational Period (Xdays/year): | |
Comment: | Connected to Curup and onto Bukit Asan SubStation |
Dam Information
Dam Type: |
Dam with Run of river |
---|---|
Dam Construction Material: | Concrete Gravity Dam |
Dam Height [m]: | 16 |
Length of Dam [m]: | |
Storage Volume of Reservoir (m³): | |
Flood Storage of Reservoir: | |
Channel Material: | |
Comment: |
Economic Information
Cost (€): | |
---|---|
Donor/Financier & Percentage: | |
Tariff Levels: | |
Connected Households: | |
Connection Cost (€): | |
Cost to be Covered by Households (%): | |
Comment: | |
Link to Cost Breakdown: |