Source: http://www.wwindea.org/technology/ch02/imgs/2_1_img1_EN.jpg<br>  
 
Source: http://www.wwindea.org/technology/ch02/imgs/2_1_img1_EN.jpg<br>  
  
<br>
+
<br>  
 
 
TERNA bietet seinen Partnern Know-how und Erfahrung:<br>Um Windkraftprojekte zu initiieren, müssen günstige Standorte<br>erkannt und deren Windenergiepotenzial ermittelt<br>werden. Dazu werden Windmessungen i.d.R. über einen Zeitraum<br>von mindestens zwölf Monaten durchgeführt und<br>Windgutachten erstellt. Liegen Erfolg versprechende Windgeschwindigkeiten<br>vor, folgen Projektstudien zur technischen<br>Auslegung und zur Wirtschaftlichkeit. Auch in Finanzierungsfragen<br>berät TERNA die Partner und schließt so die Lücke<br>zwischen potenziellen Investoren und Finanzierungsangeboten<br>nationaler und internationaler Geber. Bei Bedarf<br>können CDM-Baseline-Studien erstellt und potenzielle Betreiber<br>beim Aufbau einer effizienten Betreiberstruktur beraten<br>werden. Zur Erzielung eines möglichst hohen Know-how-<br>Transfers wird eine Zusammenarbeit zwischen internationalen<br>und lokalen Fachkräften z.B. bei der Erstellung der Studien<br>angestrebt. (3d_TERNA-Studie-)<br>
 
  
 +
TERNA offers its partners know-how and experience. In<br>order to initiate wind power projects, favourable sites must<br>be identified and their wind energy potential ascertained.<br>To do this, wind measurements are normally taken over a<br>period of at least twelve months and wind reports are drawn<br>up. If promising wind speeds are found, the next step is to<br>conduct project studies investigating the technical design<br>and economic feasibility. TERNA also provides advice to<br>partners on matters of finance, thus closing the gap between<br>potential investors and offers of funding from national and<br>international donors. If required, CDM baseline studies can<br>be prepared and advice can be offered to potential operators<br>on setting up an efficient operator structure. In order to<br>ensure as much transfer of know-how as possible, efforts<br>are made to ensure cooperation between international and<br>local experts, for example when preparing the studies. (3e_TERNA-Study-2004)<br>
  
 +
<br>
  
[[Portal:Wind]]
+
[[Portal:Wind]]  
  
 
[[Category:Wind]]
 
[[Category:Wind]]

Revision as of 07:52, 7 July 2011

WORK in PROGRESS

A graphic will later be inserted that explains the agreed structure on the portal's start page, i.e. the phases of a Wind energy project.

Flow chart wind project.jpg



Source: http://www.wwindea.org/technology/ch02/imgs/2_1_img1_EN.jpg


TERNA offers its partners know-how and experience. In
order to initiate wind power projects, favourable sites must
be identified and their wind energy potential ascertained.
To do this, wind measurements are normally taken over a
period of at least twelve months and wind reports are drawn
up. If promising wind speeds are found, the next step is to
conduct project studies investigating the technical design
and economic feasibility. TERNA also provides advice to
partners on matters of finance, thus closing the gap between
potential investors and offers of funding from national and
international donors. If required, CDM baseline studies can
be prepared and advice can be offered to potential operators
on setting up an efficient operator structure. In order to
ensure as much transfer of know-how as possible, efforts
are made to ensure cooperation between international and
local experts, for example when preparing the studies. (3e_TERNA-Study-2004)