+ | The 'Mini-grid sizing guidebook’ aims at providing a quick understanding of the ruling principles of electricity demand assessment and [[Mini Grids|mini-grid]] system sizing. For the successful implementation of mini-grids in rural areas, adequate load assessment and demand forecast, as well as subsequent system sizing, are essential. The economic viability of mini-grid projects depends on the size of the installed assets - and thus the investments - which need to be backed by a payable demand in the years after commissioning. A wrongly configured system (e.g. too small or too large) will either not serve its purpose or not recover the cost required to set it up. | ||
− | + | This guidebook is divided into four chapters. Chapter 1 gives a basic introduction and overview about sizing mini-grids. Chapter 2 describes the sizing procedure for mini-grids, including a description of required data and information. The methods for the assessment of energy demand are explained in detail, and the correction of the assessed demand to the effective demand is discussed. Furthermore, forecasting energy demand and recommendations on system sizing are addressed. Chapter 3 gives an overview of existing system sizing [[Catalogue of Mini-Grid Tools|tools]], focusing on the mini-grid builder and HOMER (Hybrid optimization of multiple energy resources). Chapter 4 entails a conclusion and some final recommendations to users of the tools and handbook. | |
− | + | = Bibliography<br/> = | |
− | + | <br/>Fricke, D. (2015): “Qinous Energy Solutions: PV Hybrid in Off-Grid and Mini-Grid<br/>solutions”. Presentation given in Manila, October 2015.<br/> | |
− | + | GIZ (2015): Mini-grid builder: Web-Based Mini-Grid Tool. Available from<br/>[http://www.minigridbuilder.com/ http://www.minigridbuilder.com/] [accessed 21 June 2016]<br/> | |
− | + | HOMER (2016): Homer Energy Support Knowledgebase.<br/>[http://support.homerenergy.com/index.php?/Knowledgebase/Article/_View/272/90/10070---dispatch-strategy http://support.homerenergy.com/index.php?/Knowledgebase/Article/View/272/90/10070---dispatch-strategy] [Accessed: 17th June 2016]<br/> | |
− | + | IEA (2015): World Energy Outlook 2015. International Energy Agency, Paris, France.<br/>Available from [http://www.worldenergyoutlook.org/weo2015// http://www.worldenergyoutlook.org/weo2015//] [accessed: 17<br/>December 2015]<br/> | |
− | + | IEA (2014): Africa Energy Outlook 2014. International Energy Agency, Paris, France.<br/>Available from [http://www.worldenergyoutlook.org/africa/ http://www.worldenergyoutlook.org/africa/] [accessed 15 June<br/>2016]<br/> | |
− | + | IEA (2013): Rural Electrification with PV Hybrid Systems. International Energy<br/>Agency, Paris, France. ISBN: 978-3-906042-11-4<br/> | |
+ | |||
+ | IEA and World Bank (2015): Sustainable Energy for All 2015—Progress Toward<br/>Sustainable Energy 2015. World Bank, Washington, DC. Available from<br/>[http://www.se4all.org/sites/default/files/l/2013/09/GTF-2105-Full-Report.pdf http://www.se4all.org/sites/default/files/l/2013/09/GTF-2105-Full-Report.pdf]<br/>[accessed 15 June 2016]<br/> | ||
+ | |||
+ | IRENA (2015): IRENA Off-grid Renewable Energy Systems: Status and methodological<br/>issues. International Renewable Energy Agency (IRENA) Innovation and<br/>Technology Centre, Bonn, Germany | ||
+ | |||
+ | NRECA (2011): Guides for Electric Cooperative Development and Rural Electrification,<br/>NRECA International, [http://www.nreca.coop/what-we-do/internationalprograms/ http://www.nreca.coop/what-we-do/internationalprograms/]<br/> | ||
+ | |||
+ | RECP (2014): Mini grid policy toolkit. European Union Energy Initiative Partnership<br/>Dialogue Facility (EUEI PDF), Eschborn, Germany<br/> | ||
+ | |||
+ | SDGH (2014): Solar/Diesel Mini-Grid Handbook. Power and Water Corporation<br/>(PWC), Darwin, Australia<br/> | ||
+ | |||
+ | World Bank (2016): Current Activities and Challenges to Scaling up Mini-Grids in<br/>Kenya. Energy Sector Management Assistance Program (ESMAP). World Bank,<br/>Washington, DC.<br/> | ||
+ | |||
+ | <br/> | ||
Line 22: | Line 38: | ||
{{self|cc-by-sa-3.0}} | {{self|cc-by-sa-3.0}} | ||
− | |||
− | |||
[[Category:Tools|{{PAGENAME}}]] | [[Category:Tools|{{PAGENAME}}]] | ||
− | [[Category: | + | [[Category:Solar|{{PAGENAME}}]] |
[[Category:PV_Mini-grid|{{PAGENAME}}]] | [[Category:PV_Mini-grid|{{PAGENAME}}]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
[[Category:Productive_Use|{{PAGENAME}}]] | [[Category:Productive_Use|{{PAGENAME}}]] | ||
− | [[Category: | + | [[Category:Rural_Development|{{PAGENAME}}]] |
− | [[Category: | + | [[Category:Batteries|{{PAGENAME}}]] |
+ | [[Category:Hybrid_Systems|{{PAGENAME}}]] | ||
+ | [[Category:Grid|{{PAGENAME}}]] | ||
[[Category:Rural_Electrification|{{PAGENAME}}]] | [[Category:Rural_Electrification|{{PAGENAME}}]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
[[Category:Mini-grid|{{PAGENAME}}]] | [[Category:Mini-grid|{{PAGENAME}}]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 15:30, 26 June 2018
Summary
The 'Mini-grid sizing guidebook’ aims at providing a quick understanding of the ruling principles of electricity demand assessment and mini-grid system sizing. For the successful implementation of mini-grids in rural areas, adequate load assessment and demand forecast, as well as subsequent system sizing, are essential. The economic viability of mini-grid projects depends on the size of the installed assets - and thus the investments - which need to be backed by a payable demand in the years after commissioning. A wrongly configured system (e.g. too small or too large) will either not serve its purpose or not recover the cost required to set it up.
This guidebook is divided into four chapters. Chapter 1 gives a basic introduction and overview about sizing mini-grids. Chapter 2 describes the sizing procedure for mini-grids, including a description of required data and information. The methods for the assessment of energy demand are explained in detail, and the correction of the assessed demand to the effective demand is discussed. Furthermore, forecasting energy demand and recommendations on system sizing are addressed. Chapter 3 gives an overview of existing system sizing tools, focusing on the mini-grid builder and HOMER (Hybrid optimization of multiple energy resources). Chapter 4 entails a conclusion and some final recommendations to users of the tools and handbook.
Bibliography
Fricke, D. (2015): “Qinous Energy Solutions: PV Hybrid in Off-Grid and Mini-Grid
solutions”. Presentation given in Manila, October 2015.
GIZ (2015): Mini-grid builder: Web-Based Mini-Grid Tool. Available from
http://www.minigridbuilder.com/ [accessed 21 June 2016]
HOMER (2016): Homer Energy Support Knowledgebase.
http://support.homerenergy.com/index.php?/Knowledgebase/Article/View/272/90/10070---dispatch-strategy [Accessed: 17th June 2016]
IEA (2015): World Energy Outlook 2015. International Energy Agency, Paris, France.
Available from http://www.worldenergyoutlook.org/weo2015// [accessed: 17
December 2015]
IEA (2014): Africa Energy Outlook 2014. International Energy Agency, Paris, France.
Available from http://www.worldenergyoutlook.org/africa/ [accessed 15 June
2016]
IEA (2013): Rural Electrification with PV Hybrid Systems. International Energy
Agency, Paris, France. ISBN: 978-3-906042-11-4
IEA and World Bank (2015): Sustainable Energy for All 2015—Progress Toward
Sustainable Energy 2015. World Bank, Washington, DC. Available from
http://www.se4all.org/sites/default/files/l/2013/09/GTF-2105-Full-Report.pdf
[accessed 15 June 2016]
IRENA (2015): IRENA Off-grid Renewable Energy Systems: Status and methodological
issues. International Renewable Energy Agency (IRENA) Innovation and
Technology Centre, Bonn, Germany
NRECA (2011): Guides for Electric Cooperative Development and Rural Electrification,
NRECA International, http://www.nreca.coop/what-we-do/internationalprograms/
RECP (2014): Mini grid policy toolkit. European Union Energy Initiative Partnership
Dialogue Facility (EUEI PDF), Eschborn, Germany
SDGH (2014): Solar/Diesel Mini-Grid Handbook. Power and Water Corporation
(PWC), Darwin, Australia
World Bank (2016): Current Activities and Challenges to Scaling up Mini-Grids in
Kenya. Energy Sector Management Assistance Program (ESMAP). World Bank,
Washington, DC.
Licensing
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 11:37, 6 September 2016 | 2,007 × 2,834, 68 pages (0 bytes) | ***** (***** | *****) | User created page with UploadWizard |
You cannot overwrite this file.
File usage
The following 2 pages use this file: